# Current State — Studio 333 Ventures LLC ## Current Phase 0 autonomous window — local H1 preparation **YOU ARE HERE: PHASE 0 / PH0.VAL / PH0.VAL.C01 / H1.LOCAL.PREPARE.2026-10-04.** Current Owner authority: `attached_assets/Pasted--STUDIO-333-VENTURES-LLC-OWNER-AUTHORIZATION-PHASE-0-AU_1791066173397.txt`, SHA256 `3753df184d1a9a66873baaa2c0151fa9d5372c27924cd495864ebdfada541f58`. The Owner expressly authorizes Replit to continue eligible Phase 0 cuts in dependency order, one state-changing cut at a time, with complete contracts/evidence/review and genuine Owner gates. This direct window is not standing Governor/Execution/Review appointment, does not waive their calibrations, and does not activate Phase 1 or public product implementation. Supplement: `evidence/phase-0-autonomous-window/OWNER-CONTINUATION-2026-10-04.md`. Owner requests the trial without more routine questions, progression through PH1–PH3 and Governor collaboration. Local preparation is now checked; requested phase progression is not dependency satisfaction or completed activation. | Axis | Verified current state | |---|---| | Master Edition | v1.0 RATIFIED — canonical consolidated project source of truth | | Constitution / Technical Direction | v1.0 RATIFIED; original bytes unchanged | | Architecture | v0.2 RECONCILED CANDIDATE — NOT FROZEN | | Roadmap | 6 Phases / 12 Parents / 46 Children; no new Child or formal closure | | Authority | Phase 0 window valid; individual eligibility, cost, contract and prerequisites still required | | Current H1 cut | Local fixture prepared; 45 local author checks passed; H1 gate BLOCKED, no formal closure | | Platform observation | Prior deployment metadata unpublished; latest screenshot shows Autoscale, 2 vCPUs / 4 GiB / maximum 3; no new Publish performed by agent | | Cost boundary | USD 5 total H1, included credits only, no extra charges; actual available credits not verified | | Missing prerequisite evidence | Actual geography; maximum 1; applicable credits; safe synthetic publication excluding inherited DB/secrets; published measurements/review | | H1 | BLOCKED — VALID PREREQUISITE STOP; neither PASS nor FAIL | | H2–H11 | UNEXECUTED / NOT DEMONSTRATED; execute only under satisfied canonical dependencies and this window; no invented eligibility | | H7 geography | North America approved for disposable H1 only; actual selection not observed; full H7 not PASS | | Onboarding | PREPARED ONLY; delivered ZIP is an immutable pre-window snapshot, not live authority/state | | AI roles / calibrations | Governor, Execution and Review NOT ACTIVATED; all three calibrations NOT RUN | | Phase 1–3 / public product | Owner requests progression; dependencies/cuts unsatisfied; NOT ACTIVATED, no public release | | Providers / rights / brand / operations | Existing OPEN decisions remain OPEN; no new provider, spend or production commitment | Next required action: resolve the genuine publishing/cost prerequisites in the separate disposable H1 project. **Do not click Publish yet.** A fixture exists at `scripts/validation/h1/`, not as an approved publication artifact. Publishing documentation/API starter or the proposed production database is not H1. No more routine permission is requested for already-authorized preparation. Cost rule: USD 5 ceiling / included credits only; no paid runtime resource or recurring commitment created. No claim about Agent charges. Maximum three materially distinct troubleshooting attempts for any one blocker. Evidence: `evidence/phase-0-autonomous-window/h1-local/` and local preparation contract. Local build, positive/failure POST, headers/CSP, marker exclusion, JS-off/native form, keyboard/touch island, automated axe, JS bytes, source/candidate failure and controlled shutdown were checked. Published warm/POST/idle observations remain **0/0/0**; local browser LCP is not field or published p75 evidence. Separate review is not supplied. Temporary Node/Chromium processes were stopped. Original H1 stop and preflight editions remain preserved. ## Historical — prior documentary delivery BOOK.RATIFY.ONBOARD.2026-10-03 at PH0.PLAN was the prior ratification/onboarding/consistency-delivery position. Final ratification remains valid. Its no-technical-execution cut boundary was superseded only by the new explicit conditional Phase 0 window, not by Book ratification or onboarding preparation. Prior current editions/recipes/ZIPs are preserved under `historical/ratified-current-before-autonomous-window/`; all older RC records and the exact 395-page Reference Edition remain unchanged.