INTERNAL GOVERNANCE · EXECUTION MAP

STUDIO 333 VENTURES — EXECUTION MAP

Internal governance reference · Derived from canonical project sources · Does not grant execution authority.

INTERNAL · DERIVED ONLY v0.2 / APPROVED — PASS WITH CONDITIONS

Master Book: v1.0 / RATIFIED · Canonical snapshot: 2026-10-03T23:46:13.570212+00:00 · UI generated: 2026-10-03T23:46:20.947941+00:00

INTEGRITY · UNCHECKED

Integrity has not yet been checked. Do not rely on an unchecked freshness state.

YOU ARE HERE Select a section

YOU ARE HERE — Detailed brick-by-brick contracts

Canonical positionPHASE 0 / PH0.VAL / H1.LOCAL.PREPARE.2026-10-04
YOU ARE HEREBLOCKED — H1 PUBLISHING CONFIGURATION / COST PREREQUISITES
Master Editionv1.0 / RATIFIED
Constitutionv1.0 / RATIFIED
PlanningAPPROVED PLANNING BASELINE — PASS WITH CONDITIONS
ArchitectureRECONCILED CANDIDATE — NOT FROZEN
H1BLOCKED — VALID PREREQUISITE STOP
H2–H11H2–H11 UNEXECUTED / NOT DEMONSTRATED
Phase 1NOT ACTIVATED
Product implementationNOT AUTHORIZED
Standing GovernorNOT ACTIVATED
Execution Control RoomNOT ACTIVATED
Next canonical activityLocal synthetic preparation checked; H1 still BLOCKED. Resolve actual max1/credits/geography and database/secret exclusion before any published proof; no repeated routine approval
UI authorizationONE documentary/UI cut; consumed on delivery; STOP
Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

PH0 — Master planning, isolated validation and reviewed adoption decisions

PH0 · Master planning, isolated validation and reviewed adoption decisions REVIEW
Id
PH0
Title
Master planning, isolated validation and reviewed adoption decisions
Dependencies
Existing ratified sources and accepted recovery baseline
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
REVIEW
Validation Status
H1 BLOCKED; other technical proofs UNEXECUTED
Authorization Status
DOCUMENTARY CUT ONLY; no activation
Status
REVIEW
Objective
Adopted planning baseline and held material evidence/adoption decisions
Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
PH0.PLAN · Complete current eight-artifact planning program and handoff REVIEW_PENDING
Id
PH0.PLAN
Title
Complete current eight-artifact planning program and handoff
Phase
PH0
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
REVIEW_PENDING
Validation Status
AUTHOR CHECKS; OWNER ADOPTION RECORDED
Authorization Status
CONSUMED ON DELIVERY
Status
REVIEW_PENDING
Objective Children
Adopted master planning package / historical C01
Dependencies
Current Owner scope; governing sources; accepted baseline
Acceptance Closure
Eight artifacts delivered; Owner reports Governor-assisted review/adoption PASS WITH CONDITIONS; Book ratification recorded by Owner; formal unit closure remains pending, not author closure
PH0.PLAN.C01 · Eight-artifact planning program REVIEW_PENDING
Id
PH0.PLAN.C01
Parent
PH0.PLAN
Phase
PH0
Title
Eight-artifact planning program
Dependencies
Accepted v1.1-RC; current Owner documentary scope
Readiness
REVIEW_PENDING
Status
REVIEW_PENDING
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
REVIEW_PENDING
Validation Status
AUTHOR CHECKS ONLY
Authorization Status
CONSUMED ON DELIVERY
Profile
DOC
Scope
Current eight artifacts in specified order, queue, Brain/control view/handoff/report/new backup
Non Scope
Any proof/product/provider/ratification/activation
Acceptance Failure Tests
Full fields/traceability/consistent counts/statuses; resolved placeholders only; immutable source/prior backup integrity; missing evidence never PASS
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — DOC

Areas Tests Failure
Governing documents/derived mirrors/package; clause/scope/state/dependency/field/ID/anchor/hash consistency; conflict/missing proof/backup overwrite rejection
Evidence Risks
Source trace, audit, local static screenshots, manifests; REC-R02/04/05/06/07
Recovery Reviewer
Preserve immutable sources and prior backups; regenerate only derivatives; appointed independent Governor + applicable Owner acceptance

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Adopted master planning package / historical C01 | Current Owner scope; governing sources; accepted baseline | Eight artifacts delivered; Owner reports Governor-assisted review/adoption PASS WITH CONDITIONS; Book ratification recorded by Owner; formal unit closure remains pending, not author closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL · Bounded material and conditional H1–H11 evidence BLOCKED
Id
PH0.VAL
Title
Bounded material and conditional H1–H11 evidence
Phase
PH0
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
BLOCKED
Validation Status
H1 BLOCKED; others UNEXECUTED
Authorization Status
NOT AUTHORIZED
Status
BLOCKED
Objective Children
Material and conditional evidence / C01–C11
Dependencies
Individual Technical Direction gate contracts, actual costs/environments and valid separate authority
Acceptance Closure
Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
PH0.VAL.C01 · H1 synthetic runtime proof BLOCKED
Id
PH0.VAL.C01
Parent
PH0.VAL
Phase
PH0
Title
H1 synthetic runtime proof
Dependencies
PH0.VAL.C07; actual publishing/cost/synthetic prerequisites
Readiness
BLOCKED
Status
BLOCKED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
BLOCKED
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H1 exact single synthetic route/island/POST/marker runtime and warm/idle measurements
Non Scope
Brand UI/real CMS/DB/data/secret/product/production
Acceptance Failure Tests
Technical Direction H1 mandatory checks and methodology; 20 initial warm/10 idle exploratory observations with limits; valid stop when publishing prerequisites absent
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H1
Title
Astro/selective React/Node runtime proof in separate synthetic disposable project
Dependencies
H7 validation geography → actual publishing/cost/synthetic environment verification
Authorization Status
NOT AUTHORIZED TO RESUME
Execution Status
BLOCKED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
BLOCKED
Evidence
A–O report, ZIP, raw preflight
Condition
Required bounded runtime suitability only; no production readiness/product/next gate/freeze

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C02 · H2 CMS/revision/preview/publication proof DRAFT
Id
PH0.VAL.C02
Parent
PH0.VAL
Phase
PH0
Title
H2 CMS/revision/preview/publication proof
Dependencies
G-SPEND; approved isolated CMS contract
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H2 CMS structured revisions/media/localization/preview/publication
Non Scope
Actual public product launch/selected-vendor inference
Acceptance Failure Tests
Draft/cache/assets isolated; approved revision traceable; published content survives API outage; failed build no promotion
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H2
Title
CMS choice / publication
Dependencies
Approved isolated proof; editor/content contract; account API/quotas/cost/processor review
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
None of required proof supplied
Condition
Structured content/revisions/media/localization, protected draft/preview/publication, outage preservation, release traceability/media dependency; informs CMS choice, not implementation/publication

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C03 · H3 journal/identity/outbox proof DRAFT
Id
PH0.VAL.C03
Parent
PH0.VAL
Phase
PH0
Title
H3 journal/identity/outbox proof
Dependencies
G-SPEND; approved isolated Data/Security contract
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H3 atomic journal/intent, safe identity/pooling/dispatch proof
Non Scope
CRM/schema product/production-data use
Acceptance Failure Tests
Commit before success; rollback/no orphan intent; ambiguous/concurrent retry and restart/republish/provider-failure recovery
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H3
Title
Journal / PostgreSQL / dispatch
Dependencies
Approved isolated proof; minimal atomic acceptance/intent contract; identity/privacy/access and pool/provider limits
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
None of required proof supplied
Condition
Commit-before-success, rollback/no false success, ambiguous commits, safe retry/dedup/concurrency, restart/republish persistence, atomic delivery intent and failure recovery, restricted inspection; informs journal/access design, not schema/CRM/product authority

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C04 · H4 email/events proof DRAFT
Id
PH0.VAL.C04
Parent
PH0.VAL
Phase
PH0
Title
H4 email/events proof
Dependencies
G-SPEND; approved domain/account and correlated intent contract
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H4 controlled email delivery/events with journal correlation
Non Scope
Real unsolicited messages/customer acceptance claim
Acceptance Failure Tests
Approved account/domain/SPF/DKIM/DMARC; rejection/timeout/bounce/retry/duplicate event visible; committed acceptance survives failure
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H4
Title
Transactional email
Dependencies
Approved controlled proof; account/domain ownership and SPF/DKIM/DMARC; correlated journal-ID delivery contract
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
None of required proof supplied
Condition
Rejection/timeout/retry/bounce/duplicate-event visibility and recovery; email cannot invalidate committed acceptance; informs provider design, not setup/spend/guarantees

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C05 · H5 shared anti-abuse proof DRAFT
Id
PH0.VAL.C05
Parent
PH0.VAL
Phase
PH0
Title
H5 shared anti-abuse proof
Dependencies
G-SPEND; approved payload/enforcement/failure policy
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H5 shared enforcement and legitimate-use proof
Non Scope
Memory-only global limiter/blanket bot lockout
Acceptance Failure Tests
Concurrent/replica-equivalent controls, bounded payloads, safe logs and dependency-failure policy; shared networks usable
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H5
Title
Anti-abuse / shared enforcement
Dependencies
Approved bounded proof; payload/control policy; concurrent/replica-equivalent methodology
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
None of required proof supplied
Condition
Bounded payload/shared enforcement, legitimate/shared-network usability, safe logs and dependency-failure policy; no memory-only shared limiter; informs controls, not product exposure

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C06 · H6 analytics privacy proof DRAFT
Id
PH0.VAL.C06
Parent
PH0.VAL
Phase
PH0
Title
H6 analytics privacy proof
Dependencies
G-SPEND; approved non-private events/processors
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H6 non-private approved analytics requests
Non Scope
Names/emails/free text/private data/acceptance dependency
Acceptance Failure Tests
Inspect actual payloads and consent/blocker behavior; conversion only after durable acceptance, outage harmless
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H6
Title
Privacy-appropriate analytics
Dependencies
Approved events/processor/cost/privacy configuration and proof
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
None of required proof supplied
Condition
Actual requests exclude names/emails/free text/private project/artist data; accepted conversion follows durable acceptance; consent/blocker limits; analytics outside transaction, not acceptance truth or publication permission

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C07 · H7 validation location verification DRAFT
Id
PH0.VAL.C07
Parent
PH0.VAL
Phase
PH0
Title
H7 validation location verification
Dependencies
Existing North America approval; actual disposable-resource verification
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
LIMITED DECISION; technical proof absent
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H7 actual disposable-validation location/permanence/resource checks
Non Scope
Production geography/publish approval
Acceptance Failure Tests
Match existing North America approval or explicit exception; actual settings evidenced before H1; approved intent alone insufficient
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H7
Title
Validation geography North America approval; production is separate
Dependencies
Explicit validation Owner decision before H1; actual location remains unverified
Authorization Status
Historical limited approval reported; NO CURRENT EXECUTION
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
H1 report A/B/O + preserved prerequisite doc
Condition
Limited validation location decision only; not production H7 closure

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C08 · H8 recovery/export compatibility proof DRAFT
Id
PH0.VAL.C08
Parent
PH0.VAL
Phase
PH0
Title
H8 recovery/export compatibility proof
Dependencies
G-SPEND; actual plan/history and approved proof objectives
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H8 actual plan/history isolated restore/export/code-data compatibility
Non Scope
Production destructive restore/zero-loss claim
Acceptance Failure Tests
Recorded actual retention/history, recovered inquiries/intent and approved RPO/RTO proof objectives; safe replay limitations
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H8
Title
Recovery / coordinated restore
Dependencies
Actual plan/default-configured retention/available history; approved isolated restore/export; Owner-approved RPO/RTO
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
Documentary plan baseline only; no actual restore proof
Condition
Recovered inquiries/intent, usable export, application/database compatibility and safe replay; informs recovery reliance, not zero loss/default maximum/production acceptance

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C09 · H9 staff/secrets boundary proof DRAFT
Id
PH0.VAL.C09
Parent
PH0.VAL
Phase
PH0
Title
H9 staff/secrets boundary proof
Dependencies
Approved synthetic exposure/access inventory and responsible roles
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H9 secret-use/staff access/MFA/environment proof
Non Scope
Public custom auth/real-secret dumping
Acceptance Failure Tests
Inventory view/use privilege, scoped credentials, synthetic exposure and separation, rotation/recovery owners; no leakage
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H9
Title
Secrets / staff access
Dependencies
Approved access inventory and synthetic exposure proof; accountable rotation/recovery owners
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
Historical existence-only preflight, not required access proof
Condition
Who views secrets or executes with them, MFA where available, scoped credentials, dev/production separation, exposure controls; not privilege grant or real-secret disclosure

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C10 · H10 content/media exit proof DRAFT
Id
PH0.VAL.C10
Parent
PH0.VAL
Phase
PH0
Title
H10 content/media exit proof
Dependencies
Approved representative CMS export contract
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H10 representative CMS metadata/media exit
Non Scope
Provider selection/rights-by-export assertion
Acceptance Failure Tests
Usable content/media references/files, account/permission/cost and completeness limitations; reconstitution verified
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H10
Title
CMS export / exit
Dependencies
Approved representative content/metadata/media proof; permissions/account ownership/cost review
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
None of required proof supplied
Condition
Complete usable export/recovery/migration format, media references/files and limitations; informs portability, not selected CMS/frozen architecture

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.VAL.C11 · H11 conditional storage proof DRAFT
Id
PH0.VAL.C11
Parent
PH0.VAL
Phase
PH0
Title
H11 conditional storage proof
Dependencies
G-OPTIONAL; selected-use justification and G-SPEND
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
CONDITIONAL; NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
VAL
Scope
H11 actual storage isolation/export/recovery if justified/selected
Non Scope
Extra service by default/venture shared bucket
Acceptance Failure Tests
Project/environment/private-public/location/export boundaries; justified N/A if unselected, never false PASS
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — VAL

Areas Tests Failure
Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
Evidence Risks
Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
Recovery Reviewer
Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS

Applicable validation gate

Id
H11
Title
Storage boundaries if selected
Dependencies
Explicit justified App Storage selection and approved actual ownership/location/access/export proof
Authorization Status
NOT AUTHORIZED
Execution Status
UNEXECUTED
Validation Status
NOT DEMONSTRATED
Artifact Status
RATIFIED GATE DEFINITION — NOT PROOF
Status
VALIDATION REQUIRED
Evidence
Project-scoped documentary baseline only
Condition
Project ownership/dev-production/public-private boundaries, actual location/export/recovery, no venture sharing; N/A only if later justified without adoption, never automatic PASS

PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.REVIEW · Independent planning review and evidence-based adoption REVIEW_PENDING
Id
PH0.REVIEW
Title
Independent planning review and evidence-based adoption
Phase
PH0
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
REVIEW_PENDING
Validation Status
PLANNING ADOPTION RECORDED; TECHNICAL ADOPTION PENDING
Authorization Status
NOT AUTHORIZED
Status
REVIEW_PENDING
Objective Children
Independent planning and adoption / C01–C02
Dependencies
Delivered planning; appointed independent function; applicable gate evidence
Acceptance Closure
Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation
PH0.REVIEW.C01 · Independent planning review and disposition REVIEW_PENDING
Id
PH0.REVIEW.C01
Parent
PH0.REVIEW
Phase
PH0
Title
Independent planning review and disposition
Dependencies
PH0.PLAN.C01 delivered v1.2-RC; current Owner disposition
Readiness
DISPOSITION RECORDED
Status
DISPOSITION RECORDED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
REVIEW_PENDING
Validation Status
OWNER-REPORTED GOVERNOR-ASSISTED REVIEW; PASS WITH CONDITIONS
Authorization Status
NOT AUTHORIZED FOR NEW EXECUTION
Profile
REV
Scope
Separate independent review of all eight candidate artifacts, queue and planning package
Non Scope
Appointment/self-ratification/implementation
Acceptance Failure Tests
Trace requirements and cross-document conflicts; issue pass/gaps/fail/blocked findings; applicable explicit ratification/conditions separate
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — REV

Areas Tests Failure
Planning/evidence/adoption records; full version review, contradictions, false authority and mandatory-gate gap assessment
Evidence Risks
Independently attributable review findings/disposition, not author assurance; REC-R02/04 and material AR risks
Recovery Reviewer
No implementation changes during review; preserve originals/correct under explicit rework; appointed independent Governor, applicable ratifier/Owner

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Independent planning and adoption / C01–C02 | Delivered planning; appointed independent function; applicable gate evidence | Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH0.REVIEW.C02 · Technology/architecture adoption reconciliation DRAFT
Id
PH0.REVIEW.C02
Parent
PH0.REVIEW
Phase
PH0
Title
Technology/architecture adoption reconciliation
Dependencies
PH0.REVIEW.C01; applicable PH0.VAL evidence; G-SPEND
Readiness
VALIDATION REQUIRED
Status
VALIDATION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
MATERIAL DEPENDENCIES UNPROVEN
Authorization Status
NOT AUTHORIZED
Profile
REV
Scope
Reconcile material proofs, decisions and affected architecture/spec versions
Non Scope
Framework race/freeze unsupported sections
Acceptance Failure Tests
Applicable gates reviewed, open conditions held, provider/cost/ownership decisions recorded; direction-level vs full freeze explicit
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — REV

Areas Tests Failure
Planning/evidence/adoption records; full version review, contradictions, false authority and mandatory-gate gap assessment
Evidence Risks
Independently attributable review findings/disposition, not author assurance; REC-R02/04 and material AR risks
Recovery Reviewer
No implementation changes during review; preserve originals/correct under explicit rework; appointed independent Governor, applicable ratifier/Owner

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
Owner Gates
Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
Exit Criteria
Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit

Parent acceptance / dependency contract

Independent planning and adoption / C01–C02 | Delivered planning; appointed independent function; applicable gate evidence | Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown

PH1 — Public presentation and controlled publication foundation

PH1 · Public presentation and controlled publication foundation DRAFT
Id
PH1
Title
Public presentation and controlled publication foundation
Dependencies
PH0 applicable exit, G-PLAN, G-ARCH
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective
Build approved public presentation/publication foundation
Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
PH1.PRESENT · Accessible responsive public presentation DRAFT
Id
PH1.PRESENT
Title
Accessible responsive public presentation
Phase
PH1
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Accessible public presentation / C01–C04
Dependencies
G-PLAN/G-ARCH; approved Brand/Design/Data contracts
Acceptance Closure
Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PRESENT.C01 · Public application foundation DRAFT
Id
PH1.PRESENT.C01
Parent
PH1.PRESENT
Phase
PH1
Title
Public application foundation
Dependencies
G-PLAN; G-ARCH; PH0.REVIEW.C02
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
UI
Scope
Approved content-first application foundation and environment-safe build
Non Scope
Future client/OS/auth/product expansion
Acceptance Failure Tests
Reviewed framework/version/build configuration; approved public/server boundaries; clean build/no secret exposure
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — UI

Areas Tests Failure
Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
Evidence Risks
Screens/DOM/interaction/a11y/asset results; AR08/14/15
Recovery Reviewer
Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH1.PRESENT.C02 · Responsive navigation/layout DRAFT
Id
PH1.PRESENT.C02
Parent
PH1.PRESENT
Phase
PH1
Title
Responsive navigation/layout
Dependencies
PH1.PRESENT.C01; reviewed Brand/Design
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
UI
Scope
Responsive primary/footer/mobile navigation and layout
Non Scope
Empty Labs/Insights/Login/mandatory GPU
Acceptance Failure Tests
Exact destinations/order, keyboard/touch/focus/reflow; visible Music/business CTA; no hover-only path
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — UI

Areas Tests Failure
Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
Evidence Risks
Screens/DOM/interaction/a11y/asset results; AR08/14/15
Recovery Reviewer
Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH1.PRESENT.C03 · Public editorial/evidence templates DRAFT
Id
PH1.PRESENT.C03
Parent
PH1.PRESENT
Phase
PH1
Title
Public editorial/evidence templates
Dependencies
PH1.PRESENT.C02; reviewed content contracts
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
UI
Scope
Home/practice/about/legal/work/case-study/music templates
Non Scope
Fabricated live proof/full artist EPK
Acceptance Failure Tests
Structured contracts, three proof dimensions, English metadata/no-JS reading; absent media/proof does not fabricate content
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — UI

Areas Tests Failure
Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
Evidence Risks
Screens/DOM/interaction/a11y/asset results; AR08/14/15
Recovery Reviewer
Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH1.PRESENT.C04 · Truthful inquiry/degraded interface DRAFT
Id
PH1.PRESENT.C04
Parent
PH1.PRESENT
Phase
PH1
Title
Truthful inquiry/degraded interface
Dependencies
PH1.PRESENT.C02; reviewed acceptance/identity contract
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
UI
Scope
Accessible practice-specific inquiry states
Non Scope
Public uploads/accounts/browser persistence queue
Acceptance Failure Tests
Invalid/loading/confirmed/ambiguous/unavailable states distinct; never success before actual durable-confirmation response
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — UI

Areas Tests Failure
Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
Evidence Risks
Screens/DOM/interaction/a11y/asset results; AR08/14/15
Recovery Reviewer
Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH1.PUBLISH · Protected approved-revision release/media pipeline DRAFT
Id
PH1.PUBLISH
Title
Protected approved-revision release/media pipeline
Phase
PH1
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Approved release resilience / C01–C03
Dependencies
CMS/preview/export evidence and presentation contracts
Acceptance Closure
Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure
PH1.PUBLISH.C01 · Protected revision preview DRAFT
Id
PH1.PUBLISH.C01
Parent
PH1.PUBLISH
Phase
PH1
Title
Protected revision preview
Dependencies
PH1.PRESENT.C03; PH0.VAL.C02; PH0.VAL.C09
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
PUB
Scope
Protected approved-revision CMS preview
Non Scope
Public drafts/preview inquiry into production
Acceptance Failure Tests
Authentication/cache/assets/noindex checked; actual approved revision stable; unauthorized edits excluded
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — PUB

Areas Tests Failure
CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal
Evidence Risks
Requests/build/media/provenance/export/removal evidence; AR02/07/10/16
Recovery Reviewer
Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH1.PUBLISH.C02 · Checked release/promotion/provenance DRAFT
Id
PH1.PUBLISH.C02
Parent
PH1.PUBLISH
Phase
PH1
Title
Checked release/promotion/provenance
Dependencies
PH1.PUBLISH.C01; approved publication authority model
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
PUB
Scope
Successful-only release build/promotion/provenance
Non Scope
Auto-publication permission/second CMS truth
Acceptance Failure Tests
App/content/assets/approval/time attributable; failed fetch/check retains last valid release; trigger replay safe
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — PUB

Areas Tests Failure
CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal
Evidence Risks
Requests/build/media/provenance/export/removal evidence; AR02/07/10/16
Recovery Reviewer
Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH1.PUBLISH.C03 · Media/CDN/export/withdrawal behavior DRAFT
Id
PH1.PUBLISH.C03
Parent
PH1.PUBLISH
Phase
PH1
Title
Media/CDN/export/withdrawal behavior
Dependencies
PH1.PUBLISH.C02; PH0.VAL.C10
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
PUB
Scope
Media availability/export/cache withdrawal
Non Scope
Unjustified extra storage/private document vault
Acceptance Failure Tests
API vs CDN outages distinct; text/nav/intake useful; assets/export/corrective removal rights-valid
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — PUB

Areas Tests Failure
CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal
Evidence Risks
Requests/build/media/provenance/export/removal evidence; AR02/07/10/16
Recovery Reviewer
Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
Owner Gates
Approved brand direction, material dependency/spend; no production publish
Exit Criteria
Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted

Parent acceptance / dependency contract

Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown

PH2 — Approved content and reliable business/music intake

PH2 · Approved content and reliable business/music intake DRAFT
Id
PH2
Title
Approved content and reliable business/music intake
Dependencies
PH1 foundation; content/journal decisions
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective
Populate truthful content and reliable practice-specific intake
Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
PH2.CONTENT · Accurate approved company/work/music material DRAFT
Id
PH2.CONTENT
Title
Accurate approved company/work/music material
Phase
PH2
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
RIGHTS/CONTENT REQUIRED
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Factual approved public material / C01–C03
Dependencies
Actual sources/rights/approved copy and content contracts
Acceptance Closure
All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content
PH2.CONTENT.C01 · Company/offers/legal content DRAFT
Id
PH2.CONTENT.C01
Parent
PH2.CONTENT
Phase
PH2
Title
Company/offers/legal content
Dependencies
G-CONTENT; PH1.PUBLISH.C01
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
CONTENT APPROVAL REQUIRED
Authorization Status
NOT AUTHORIZED
Profile
CNT
Scope
Actual company/offers/contact/privacy/legal/SEO copy
Non Scope
Invented offers/guarantees/legal compliance
Acceptance Failure Tests
Sources/approvals per revision; real responder/contact and privacy practices; unsupported copy omitted/referred for approval
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — CNT

Areas Tests Failure
Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded
Evidence Risks
Exact item approval/source/permission, no fabricated evidence; AR07/13
Recovery Reviewer
Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH2.CONTENT.C02 · Work/case-study proof DRAFT
Id
PH2.CONTENT.C02
Parent
PH2.CONTENT
Phase
PH2
Title
Work/case-study proof
Dependencies
G-CONTENT; PH1.PRESENT.C03
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
RIGHTS/FACTS REQUIRED
Authorization Status
NOT AUTHORIZED
Profile
CNT
Scope
Actual Work/case-study material
Non Scope
Venture live-system connection/fake client results
Acceptance Failure Tests
Accurate relationship/maturity/publication, permitted evidence/media/disclosure; withdrawal honored
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — CNT

Areas Tests Failure
Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded
Evidence Risks
Exact item approval/source/permission, no fabricated evidence; AR07/13
Recovery Reviewer
Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH2.CONTENT.C03 · Curated Music proof DRAFT
Id
PH2.CONTENT.C03
Parent
PH2.CONTENT
Phase
PH2
Title
Curated Music proof
Dependencies
G-CONTENT; PH1.PRESENT.C03
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
RIGHTS/FACTS REQUIRED
Authorization Status
NOT AUTHORIZED
Profile
CNT
Scope
Small approved Music proof/service material
Non Scope
Label/DSP/exclusive/royalty authority assumptions
Acceptance Failure Tests
Exact positioning/role/rights/asset/permission approval; no EPK or operations scope expansion
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — CNT

Areas Tests Failure
Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded
Evidence Risks
Exact item approval/source/permission, no fabricated evidence; AR07/13
Recovery Reviewer
Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH2.INTAKE · Atomic journal acceptance and recoverable delivery DRAFT
Id
PH2.INTAKE
Title
Atomic journal acceptance and recoverable delivery
Phase
PH2
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Durable qualified inquiry acceptance / C01–C04
Dependencies
H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts
Acceptance Closure
Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH2.INTAKE.C01 · Business/music server validation DRAFT
Id
PH2.INTAKE.C01
Parent
PH2.INTAKE
Phase
PH2
Title
Business/music server validation
Dependencies
PH1.PRESENT.C04; PH0.VAL.C03; approved minimum fields
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INQ
Scope
Server-validated bounded business/music contract
Non Scope
Upload/login/automatic commercial commitment
Acceptance Failure Tests
Invalid/oversized/unsupported practice rejected, minimized approved fields and safe errors; client bypass harmless
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INQ

Areas Tests Failure
Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
Evidence Risks
Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
Recovery Reviewer
Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH2.INTAKE.C02 · Atomic acceptance and safe retry identity DRAFT
Id
PH2.INTAKE.C02
Parent
PH2.INTAKE
Phase
PH2
Title
Atomic acceptance and safe retry identity
Dependencies
PH2.INTAKE.C01; reviewed H3 identity/commit policy
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INQ
Scope
Atomic accepted inquiry/required intent and reviewed identity
Non Scope
Public lookup/CRM/exactly-once promise
Acceptance Failure Tests
Rollback/no false success; ambiguity/lost-response/concurrent duplicate/conflict tests satisfy actual policy
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INQ

Areas Tests Failure
Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
Evidence Risks
Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
Recovery Reviewer
Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH2.INTAKE.C03 · Recoverable dispatch across idle/replicas DRAFT
Id
PH2.INTAKE.C03
Parent
PH2.INTAKE
Phase
PH2
Title
Recoverable dispatch across idle/replicas
Dependencies
PH2.INTAKE.C02; PH0.VAL.C04; approved activation mechanism
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INQ
Scope
Durable recoverable dispatch trigger/retry/limits
Non Scope
Post-response fire-and-forget/custom message platform
Acceptance Failure Tests
Idle/restart/replica/timeout/unknown outcome safely recovered; accepted data retained; bounded attempts/manual attention
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INQ

Areas Tests Failure
Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
Evidence Risks
Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
Recovery Reviewer
Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH2.INTAKE.C04 · Restricted staff inspection/recovery DRAFT
Id
PH2.INTAKE.C04
Parent
PH2.INTAKE
Phase
PH2
Title
Restricted staff inspection/recovery
Dependencies
PH2.INTAKE.C03; PH0.VAL.C09; G-OPS
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INQ
Scope
Restricted minimal inspect/retry/disposition process
Non Scope
Bespoke admin/CRM sales stages
Acceptance Failure Tests
Authorized staff find unresolved intent/acceptance safely, recover without duplicate effects; private access and audit
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INQ

Areas Tests Failure
Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
Evidence Risks
Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
Recovery Reviewer
Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1 affected contracts; approved content/fields; selected verified journal design
Owner Gates
Claims/rights/offers; permitted data/response ownership
Exit Criteria
Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted

Parent acceptance / dependency contract

Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown

PH3 — Integrations, quality and integrated failure/recovery assurance

PH3 · Integrations, quality and integrated failure/recovery assurance DRAFT
Id
PH3
Title
Integrations, quality and integrated failure/recovery assurance
Dependencies
PH1/PH2 affected interfaces
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective
Integrate bounded services and establish end-to-end quality
Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
PH3.CONNECT · Bounded provider integrations and observability DRAFT
Id
PH3.CONNECT
Title
Bounded provider integrations and observability
Phase
PH3
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Bounded services / C01–C06
Dependencies
Approved adapters/providers/cost/privacy; accepted intent contracts
Acceptance Closure
Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C01 · Email and verified callback integration DRAFT
Id
PH3.CONNECT.C01
Parent
PH3.CONNECT
Phase
PH3
Title
Email and verified callback integration
Dependencies
PH2.INTAKE.C03; PH0.VAL.C04
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INT
Scope
Selected email adapter and verified callbacks
Non Scope
Provider events as inquiry truth
Acceptance Failure Tests
Rejection/timeout/signature/replay/duplicate/out-of-order/bounce safely correlated; acceptance invariant intact
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INT

Areas Tests Failure
Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
Evidence Risks
Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
Recovery Reviewer
Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.CONNECT.C02 · Non-private acceptance analytics DRAFT
Id
PH3.CONNECT.C02
Parent
PH3.CONNECT
Phase
PH3
Title
Non-private acceptance analytics
Dependencies
PH2.INTAKE.C02; PH0.VAL.C06; approved privacy config
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INT
Scope
Approved non-private analytics integration
Non Scope
Inquiry payloads/mandatory tracking for acceptance
Acceptance Failure Tests
Actual emitted requests inspected; conversion commit-linked, consent/blocker limits; unavailable analytics harmless
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INT

Areas Tests Failure
Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
Evidence Risks
Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
Recovery Reviewer
Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.CONNECT.C03 · Shared intake anti-abuse controls DRAFT
Id
PH3.CONNECT.C03
Parent
PH3.CONNECT
Phase
PH3
Title
Shared intake anti-abuse controls
Dependencies
PH2.INTAKE.C01; PH0.VAL.C05
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INT
Scope
Selected shared anti-abuse integration
Non Scope
Replica-local authoritative enforcement
Acceptance Failure Tests
Concurrent controls/legitimate network usability/provider outage policy; safe diagnostics and no fake success
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INT

Areas Tests Failure
Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
Evidence Risks
Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
Recovery Reviewer
Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.CONNECT.C04 · Conditional CRM handoff DRAFT
Id
PH3.CONNECT.C04
Parent
PH3.CONNECT
Phase
PH3
Title
Conditional CRM handoff
Dependencies
G-OPTIONAL; PH2.INTAKE.C03
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
CONDITIONAL; UNPROVEN
Authorization Status
NOT AUTHORIZED
Profile
INT
Scope
Optional approved CRM minimal handoff
Non Scope
Custom CRM/journal sales pipeline
Acceptance Failure Tests
Owner adoption or explicit deferral; correlated retry/unknown result recovery; CRM outage never erases inquiry
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INT

Areas Tests Failure
Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
Evidence Risks
Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
Recovery Reviewer
Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.CONNECT.C05 · Conditional managed booking DRAFT
Id
PH3.CONNECT.C05
Parent
PH3.CONNECT
Phase
PH3
Title
Conditional managed booking
Dependencies
G-OPTIONAL; PH1.PRESENT.C02
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
CONDITIONAL; UNPROVEN
Authorization Status
NOT AUTHORIZED
Profile
INT
Scope
Optional approved managed booking path
Non Scope
Custom scheduler/booking as acceptance truth
Acceptance Failure Tests
Owner adoption or deferral; privacy/a11y/script and unavailable-vendor fallback; no false appointment
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INT

Areas Tests Failure
Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
Evidence Risks
Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
Recovery Reviewer
Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.CONNECT.C06 · Safe operational monitoring/alerts DRAFT
Id
PH3.CONNECT.C06
Parent
PH3.CONNECT
Phase
PH3
Title
Safe operational monitoring/alerts
Dependencies
PH2.INTAKE.C04; approved incident/alert ownership
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Profile
INT
Scope
Safe health/intent/error alerts and response route
Non Scope
Private payload logs/custom operational dashboard
Acceptance Failure Tests
Missing/delayed dispatch and failures detectable, bounded duplicate alerts, responsible operator/backup and privacy
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — INT

Areas Tests Failure
Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
Evidence Risks
Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
Recovery Reviewer
Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.QUALITY · Integrated accessibility/performance/security/recovery DRAFT
Id
PH3.QUALITY
Title
Integrated accessibility/performance/security/recovery
Phase
PH3
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
PENDING VALIDATION
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Integrated quality and failure assurance / C01–C04
Dependencies
Relevant implementation/integration/content; actual test environment
Acceptance Closure
Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH3.QUALITY.C01 · Accessibility/responsive acceptance DRAFT
Id
PH3.QUALITY.C01
Parent
PH3.QUALITY
Phase
PH3
Title
Accessibility/responsive acceptance
Dependencies
PH1.PRESENT.C03; PH1.PRESENT.C04; PH2.INTAKE.C01
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
QA
Scope
Integrated WCAG/responsive/reduced-motion acceptance
Non Scope
Cosmetic screenshot as conformance proof
Acceptance Failure Tests
Keyboard/screen-reader/errors/focus/contrast/zoom/reflow/no-JS/motion checks on both practices and degraded states
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — QA

Areas Tests Failure
Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
Evidence Risks
Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
Recovery Reviewer
Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.QUALITY.C02 · Performance/SEO/media hardening DRAFT
Id
PH3.QUALITY.C02
Parent
PH3.QUALITY
Phase
PH3
Title
Performance/SEO/media hardening
Dependencies
PH1.PUBLISH.C03; PH3.CONNECT.C02; approved launch material
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
QA
Scope
Performance/SEO/social/media budgets
Non Scope
Lab metrics as adequate field proof
Acceptance Failure Tests
Measured JS/LCP/interaction/layout budgets, approved metadata/canonical/robots/media; actual limits and field follow-up
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — QA

Areas Tests Failure
Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
Evidence Risks
Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
Recovery Reviewer
Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.QUALITY.C03 · Integrated security/access/privacy assurance DRAFT
Id
PH3.QUALITY.C03
Parent
PH3.QUALITY
Phase
PH3
Title
Integrated security/access/privacy assurance
Dependencies
PH3.CONNECT.C01; PH3.CONNECT.C03; PH1.PUBLISH.C01
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
QA
Scope
Integrated headers/trust/abuse/preview/privacy/access
Non Scope
Unapproved risk waiver/new auth
Acceptance Failure Tests
Successful/error headers, secret/PII/draft/cache isolation, signed/replayed callbacks and shared abuse controls
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — QA

Areas Tests Failure
Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
Evidence Risks
Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
Recovery Reviewer
Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH3.QUALITY.C04 · Integrated outage/restore/replay assurance DRAFT
Id
PH3.QUALITY.C04
Parent
PH3.QUALITY
Phase
PH3
Title
Integrated outage/restore/replay assurance
Dependencies
PH0.VAL.C08; PH3.CONNECT.C06; PH3.CONNECT.C01; PH1.PUBLISH.C02
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
QA
Scope
Integrated dependency outage/restore/replay drills
Non Scope
Destructive production test without authority
Acceptance Failure Tests
CMS/media/journal/email failure, failed build, ambiguous commits, restart/replica dispatch, coordinated restore/replay satisfy actual objectives
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — QA

Areas Tests Failure
Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
Evidence Risks
Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
Recovery Reviewer
Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH1/PH2 interfaces; approved provider/cost/privacy contracts
Owner Gates
Conditional CRM/booking; material risk/cost/processor exceptions
Exit Criteria
Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference

Parent acceptance / dependency contract

Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown

PH4 — Operational/production readiness and explicitly approved launch

PH4 · Operational/production readiness and explicitly approved launch DRAFT
Id
PH4
Title
Operational/production readiness and explicitly approved launch
Dependencies
PH3 accepted readiness; G-OPS/G-CONTENT/G-LAUNCH
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective
Confirm operations, production location and controlled launch
Entry Conditions
PH3 readiness; approved actual release/rights, operating owners and recovery
Owner Gates
Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
Exit Criteria
Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
PH4.OPS · Actual operating/legal/access/recovery readiness DRAFT
Id
PH4.OPS
Title
Actual operating/legal/access/recovery readiness
Phase
PH4
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Actual operational readiness / C01–C03
Dependencies
Quality/recovery/content evidence, G-OPS
Acceptance Closure
Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals
PH4.OPS.C01 · Actual access/privacy/processor readiness DRAFT
Id
PH4.OPS.C01
Parent
PH4.OPS
Phase
PH4
Title
Actual access/privacy/processor readiness
Dependencies
PH3.QUALITY.C03; G-OPS
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
OPS
Scope
Actual privacy/processors/retention/access settings
Non Scope
Template legal certainty/default maximum claim
Acceptance Failure Tests
Legal/Owner and staff access approvals; actual scoped roles/locations/retention/MFA/secrets boundaries
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — OPS

Areas Tests Failure
Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure
Evidence Risks
Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14
Recovery Reviewer
Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH3 readiness; approved actual release/rights, operating owners and recovery
Owner Gates
Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
Exit Criteria
Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved

Parent acceptance / dependency contract

Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH4.OPS.C02 · Recovery/incident/responding runbooks DRAFT
Id
PH4.OPS.C02
Parent
PH4.OPS
Phase
PH4
Title
Recovery/incident/responding runbooks
Dependencies
PH3.QUALITY.C04; G-OPS
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
OPS
Scope
Operating recovery/incident/response ownership/runbooks
Non Scope
Unsupported RPO/RTO/zero-loss promise
Acceptance Failure Tests
Named responsible/backup roles, response targets, actual recovery history/RPO/RTO/replay and alert/revocation rehearsal
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — OPS

Areas Tests Failure
Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure
Evidence Risks
Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14
Recovery Reviewer
Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH3 readiness; approved actual release/rights, operating owners and recovery
Owner Gates
Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
Exit Criteria
Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved

Parent acceptance / dependency contract

Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH4.OPS.C03 · Final approved rights/content/release DRAFT
Id
PH4.OPS.C03
Parent
PH4.OPS
Phase
PH4
Title
Final approved rights/content/release
Dependencies
PH2.CONTENT.C01; PH2.CONTENT.C02; PH2.CONTENT.C03; PH1.PUBLISH.C03
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
RELEASE APPROVAL REQUIRED
Authorization Status
NOT AUTHORIZED
Profile
OPS
Scope
Exact launch content/media/claim/release approval
Non Scope
Automatic restoration of revoked proof
Acceptance Failure Tests
Approved revision and all asset/relationship/legal permissions; correction/withdrawal plan, publisher/rights ownership
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — OPS

Areas Tests Failure
Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure
Evidence Risks
Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14
Recovery Reviewer
Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH3 readiness; approved actual release/rights, operating owners and recovery
Owner Gates
Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
Exit Criteria
Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved

Parent acceptance / dependency contract

Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH4.LAUNCH · Owner-controlled geography/first publish/release DRAFT
Id
PH4.LAUNCH
Title
Owner-controlled geography/first publish/release
Phase
PH4
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Explicitly controlled publication / C01–C02
Dependencies
OPS and QUALITY required closure; G-LAUNCH
Acceptance Closure
Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference
PH4.LAUNCH.C01 · Production geography and launch authorization DRAFT
Id
PH4.LAUNCH.C01
Parent
PH4.LAUNCH
Phase
PH4
Title
Production geography and launch authorization
Dependencies
PH4.OPS.C01; PH4.OPS.C02; PH4.OPS.C03; PH3.QUALITY.C01; PH3.QUALITY.C02
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
H7 PRODUCTION DISTINCT
Authorization Status
NOT AUTHORIZED
Profile
LAUNCH
Scope
Production location preflight and explicit Owner go/no-go
Non Scope
Validation region as production consent
Acceptance Failure Tests
Actual compute/DB/storage/pre-created/external processor locations, reviewed quality/ops/rights and specific first-publish authority
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — LAUNCH

Areas Tests Failure
Actual location/release/production transition; preflight, go/no-go, approved promotion and rollback/removal cases
Evidence Risks
Explicit Owner authority/location/quality/release/operating readiness; AR07/11/12/13/16
Recovery Reviewer
Safe rights-valid rollback/correction; protect accepted data, destructive effects separately authorized; Owner + designated release reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH3 readiness; approved actual release/rights, operating owners and recovery
Owner Gates
Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
Exit Criteria
Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved

Parent acceptance / dependency contract

Explicitly controlled publication / C01–C02 | OPS and QUALITY required closure; G-LAUNCH | Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH4.LAUNCH.C02 · Authorized controlled first publish DRAFT
Id
PH4.LAUNCH.C02
Parent
PH4.LAUNCH
Phase
PH4
Title
Authorized controlled first publish
Dependencies
PH4.LAUNCH.C01; G-LAUNCH; reviewed release/rollback evidence
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
LAUNCH
Scope
Controlled explicitly authorized first publication
Non Scope
Domain/provider/resources outside cut
Acceptance Failure Tests
Only approved release promoted; attributable provenance and safe rights-valid rollback/correction; no data reset
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — LAUNCH

Areas Tests Failure
Actual location/release/production transition; preflight, go/no-go, approved promotion and rollback/removal cases
Evidence Risks
Explicit Owner authority/location/quality/release/operating readiness; AR07/11/12/13/16
Recovery Reviewer
Safe rights-valid rollback/correction; protect accepted data, destructive effects separately authorized; Owner + designated release reviewer

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
PH3 readiness; approved actual release/rights, operating owners and recovery
Owner Gates
Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
Exit Criteria
Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved

Parent acceptance / dependency contract

Explicitly controlled publication / C01–C02 | OPS and QUALITY required closure; G-LAUNCH | Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown

PH5 — Post-launch verification and operating handoff

PH5 · Post-launch verification and operating handoff DRAFT
Id
PH5
Title
Post-launch verification and operating handoff
Dependencies
Authorized PH4 launch
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective
Verify actual launch and continued operations
Entry Conditions
Authorized PH4 release; controlled production verification authority
Owner Gates
Residual significant risk and major-phase/launch acceptance
Exit Criteria
Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded
PH5.VERIFY · Actual public behavior and operating follow-through DRAFT
Id
PH5.VERIFY
Title
Actual public behavior and operating follow-through
Phase
PH5
Artifact Status
APPROVED PLANNING CONTRACT
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Status
DRAFT
Objective Children
Post-launch proof and acceptance / C01–C03
Dependencies
Published approved release and verification authority
Acceptance Closure
Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance
PH5.VERIFY.C01 · Public release and inquiry smoke verification DRAFT
Id
PH5.VERIFY.C01
Parent
PH5.VERIFY
Phase
PH5
Title
Public release and inquiry smoke verification
Dependencies
PH4.LAUNCH.C02; authorized controlled production test data
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
POST
Scope
Actual public release/business/music inquiry verification
Non Scope
Unapproved real test PII/unbounded live traffic
Acceptance Failure Tests
Route/SEO/headers/approved revision, controlled accepted inquiries/intents/delivery and staff visibility verified
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — POST

Areas Tests Failure
Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic
Evidence Risks
Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16
Recovery Reviewer
Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Authorized PH4 release; controlled production verification authority
Owner Gates
Residual significant risk and major-phase/launch acceptance
Exit Criteria
Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded

Parent acceptance / dependency contract

Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH5.VERIFY.C02 · Field/operational follow-through DRAFT
Id
PH5.VERIFY.C02
Parent
PH5.VERIFY
Phase
PH5
Title
Field/operational follow-through
Dependencies
PH5.VERIFY.C01; adequate actual observations and assigned operators
Readiness
DEPENDENCY UNSATISFIED
Status
DEPENDENCY UNSATISFIED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
NOT DEMONSTRATED
Authorization Status
NOT AUTHORIZED
Profile
POST
Scope
Field quality and operational follow-through
Non Scope
Fabricated p75/traffic or treating email as response
Acceptance Failure Tests
Adequate observed field samples or explicit unproven limits, monitored intent recovery and actual responder/backup process
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — POST

Areas Tests Failure
Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic
Evidence Risks
Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16
Recovery Reviewer
Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Authorized PH4 release; controlled production verification authority
Owner Gates
Residual significant risk and major-phase/launch acceptance
Exit Criteria
Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded

Parent acceptance / dependency contract

Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown
PH5.VERIFY.C03 · Launch review and operating handoff DRAFT
Id
PH5.VERIFY.C03
Parent
PH5.VERIFY
Phase
PH5
Title
Launch review and operating handoff
Dependencies
PH5.VERIFY.C01; PH5.VERIFY.C02; Owner major-phase acceptance
Readiness
OWNER DECISION REQUIRED
Status
OWNER DECISION REQUIRED
Artifact Status
APPROVED PLANNING CONTRACT — CONDITIONS HELD
Execution Status
DRAFT
Validation Status
REVIEW REQUIRED
Authorization Status
NOT AUTHORIZED
Profile
POST
Scope
Independent launch review/operating handoff
Non Scope
Automatic next feature/OS/Phase expansion
Acceptance Failure Tests
Required evidence/major-phase acceptance, risk/condition ownership and follow-ups recorded; STOP
Contract Source
03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
Technical Cut
PENDING VALIDATION / DEPENDENCY UNSATISFIED

Named normative test / evidence / risk / recovery / reviewer profile — POST

Areas Tests Failure
Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic
Evidence Risks
Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16
Recovery Reviewer
Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance

Inherited Child requirements (apply together with this row and status/dependency row)

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Phase entry / Owner gates / exit conditions

Entry Conditions
Authorized PH4 release; controlled production verification authority
Owner Gates
Residual significant risk and major-phase/launch acceptance
Exit Criteria
Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded

Parent acceptance / dependency contract

Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown
Canonical source · v0.2 · SHA256
Path
docs/project-brain/02_MASTER_ROADMAP.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
07cd7412ed860deae148071a1611d872fdefbfae616c78f79a4c089a2726b001
Source
View canonical source · Download Markdown

PHASE / PARENT / CHILD STRUCTURE v0.2 — APPROVED PLANNING BASELINE

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

PHASE / PARENT / CHILD STRUCTURE v0.2 — APPROVED PLANNING BASELINE

Phase 0 · 3 October 2026 · Owner adoption: PASS WITH CONDITIONS · NOT ACTIVATED

Sources: Master Planning Completion §10; Constitution VI/VII/IX/XV; Technical Direction H; Architecture §24; five preceding specifications and Roadmap v0.2. Owner Planning Disposition §§1/4 adopts these contracts as the official planning decomposition, with open conditions held. Planning approval is not operational activation.

PROJECT → PHASE → PARENT → CHILD → EXECUTION CUT → IMPLEMENTATION / ANALYSIS → TESTING → EVIDENCE → REVIEW → CLOSURE.

There are 6 approved planning Phases, 12 Parents and 46 Children. H1 historical cut IDs remain history, not retroactively renamed. PH0.PLAN.C01 records the original documentary program; the separately Owner-authorized Book cut is associated with PH0.PLAN for reporting only and does not add or activate a roadmap Child. No future Child has execution authority.

Phase contracts

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

Phase contracts

PhaseObjectiveEntry / dependenciesParentsOwner gatesExit criteria
PH0Adopted planning baseline and held material evidence/adoption decisionsRatified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authorityPH0.PLAN, PH0.VAL, PH0.REVIEWPlanning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approvalOwner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
PH1Build approved public presentation/publication foundationPH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cutPH1.PRESENT, PH1.PUBLISHApproved brand direction, material dependency/spend; no production publishResponsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
PH2Populate truthful content and reliable practice-specific intakePH1 affected contracts; approved content/fields; selected verified journal designPH2.CONTENT, PH2.INTAKEClaims/rights/offers; permitted data/response ownershipApproved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
PH3Integrate bounded services and establish end-to-end qualityPH1/PH2 interfaces; approved provider/cost/privacy contractsPH3.CONNECT, PH3.QUALITYConditional CRM/booking; material risk/cost/processor exceptionsRequired integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
PH4Confirm operations, production location and controlled launchPH3 readiness; approved actual release/rights, operating owners and recoveryPH4.OPS, PH4.LAUNCHActual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gatesExplicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
PH5Verify actual launch and continued operationsAuthorized PH4 release; controlled production verification authorityPH5.VERIFYResidual significant risk and major-phase/launch acceptancePublic/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded

Phase non-scope everywhere: public auth/uploads/AI/client OS/custom CRM/custom admin/royalty/distribution backend, venture coupling and unapproved product scope. Phase risks are inherited from contained profiles below and 09 Risk Register; entries never assume vendor, production location or final business content. Later operational settings may be verified closer to reliance under Architecture §23.3, but held dependencies remain explicit and unpassed.

Parent contracts

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

Parent contracts

Children suffixes below expand under the exact Parent prefix; e.g. C01–C04 means four unique IDs, not a new composite unit.

ParentObjective / ChildrenDependenciesAcceptance / closure conditions
PH0.PLANAdopted master planning package / historical C01Current Owner scope; governing sources; accepted baselineEight artifacts delivered; Owner reports Governor-assisted review/adoption PASS WITH CONDITIONS; Book ratification recorded by Owner; formal unit closure remains pending, not author closure
PH0.VALMaterial and conditional evidence / C01–C11Individual Technical Direction gate contracts, actual costs/environments and valid separate authorityEach applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
PH0.REVIEWIndependent planning and adoption / C01–C02Delivered planning; appointed independent function; applicable gate evidenceExplicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation
PH1.PRESENTAccessible public presentation / C01–C04G-PLAN/G-ARCH; approved Brand/Design/Data contractsRequired templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PUBLISHApproved release resilience / C01–C03CMS/preview/export evidence and presentation contractsProtected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure
PH2.CONTENTFactual approved public material / C01–C03Actual sources/rights/approved copy and content contractsAll intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content
PH2.INTAKEDurable qualified inquiry acceptance / C01–C04H3/H4/H9 and approved minimal input/identity/dispatch/staff contractsAtomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH3.CONNECTBounded services / C01–C06Approved adapters/providers/cost/privacy; accepted intent contractsRequired email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.QUALITYIntegrated quality and failure assurance / C01–C04Relevant implementation/integration/content; actual test environmentMandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH4.OPSActual operational readiness / C01–C03Quality/recovery/content evidence, G-OPSLegal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals
PH4.LAUNCHExplicitly controlled publication / C01–C02OPS and QUALITY required closure; G-LAUNCHActual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference
PH5.VERIFYPost-launch proof and acceptance / C01–C03Published approved release and verification authorityActual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance

Every Parent closes only after each required Child is explicitly accepted/closed, mandatory criteria evidenced and its designated reviewer approves Parent acceptance. Conditional deferral/N/A must be justified and reviewed; no optional Child is falsely CLOSED or gate marked PASS. A Parent's approval never authorizes a Child.

Complete inherited Child contract

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

Complete inherited Child contract

Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.

  1. Unique ID / Parent / Phase: row ID; Parent = prefix before .C; Phase = prefix before first dot.
  2. Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
  3. Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
  4. Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
  5. Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
  6. Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
  7. Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
  8. Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
  9. Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
  10. Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
  11. Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
  12. Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
  13. Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
  14. Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.

Test / evidence / risk / recovery / reviewer profiles

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

Test / evidence / risk / recovery / reviewer profiles

ProfileAffected areas / tests and failure pathsEvidence and risksRecovery awareness / required reviewer
DOCGoverning documents/derived mirrors/package; clause/scope/state/dependency/field/ID/anchor/hash consistency; conflict/missing proof/backup overwrite rejectionSource trace, audit, local static screenshots, manifests; REC-R02/04/05/06/07Preserve immutable sources and prior backups; regenerate only derivatives; appointed independent Governor + applicable Owner acceptance
VALOnly approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement casesActual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
REVPlanning/evidence/adoption records; full version review, contradictions, false authority and mandatory-gate gap assessmentIndependently attributable review findings/disposition, not author assurance; REC-R02/04 and material AR risksNo implementation changes during review; preserve originals/correct under explicit rework; appointed independent Governor, applicable ratifier/Owner
UIPublic templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded statesScreens/DOM/interaction/a11y/asset results; AR08/14/15Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer
PUBCMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawalRequests/build/media/provenance/export/removal evidence; AR02/07/10/16Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer
CNTActual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excludedExact item approval/source/permission, no fabricated evidence; AR07/13Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval
INQServer validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage testsTransaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer
INTApproved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service testsSafe provider events/request payload audits/limits/alerts; AR04/05/09/13/14Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
QAWhole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurementsFull methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review
OPSActual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failureActual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions
LAUNCHActual location/release/production transition; preflight, go/no-go, approved promotion and rollback/removal casesExplicit Owner authority/location/quality/release/operating readiness; AR07/11/12/13/16Safe rights-valid rollback/correction; protect accepted data, destructive effects separately authorized; Owner + designated release reviewer
POSTActual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated trafficActual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance

Individual Child outcomes and acceptance

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

Individual Child outcomes and acceptance

IDProfileObjective / scopeExplicit non-scopeAcceptance / required failure cases
PH0.PLAN.C01DOCCurrent eight artifacts in specified order, queue, Brain/control view/handoff/report/new backupAny proof/product/provider/ratification/activationFull fields/traceability/consistent counts/statuses; resolved placeholders only; immutable source/prior backup integrity; missing evidence never PASS
PH0.VAL.C01VALH1 exact single synthetic route/island/POST/marker runtime and warm/idle measurementsBrand UI/real CMS/DB/data/secret/product/productionTechnical Direction H1 mandatory checks and methodology; 20 initial warm/10 idle exploratory observations with limits; valid stop when publishing prerequisites absent
PH0.VAL.C02VALH2 CMS structured revisions/media/localization/preview/publicationActual public product launch/selected-vendor inferenceDraft/cache/assets isolated; approved revision traceable; published content survives API outage; failed build no promotion
PH0.VAL.C03VALH3 atomic journal/intent, safe identity/pooling/dispatch proofCRM/schema product/production-data useCommit before success; rollback/no orphan intent; ambiguous/concurrent retry and restart/republish/provider-failure recovery
PH0.VAL.C04VALH4 controlled email delivery/events with journal correlationReal unsolicited messages/customer acceptance claimApproved account/domain/SPF/DKIM/DMARC; rejection/timeout/bounce/retry/duplicate event visible; committed acceptance survives failure
PH0.VAL.C05VALH5 shared enforcement and legitimate-use proofMemory-only global limiter/blanket bot lockoutConcurrent/replica-equivalent controls, bounded payloads, safe logs and dependency-failure policy; shared networks usable
PH0.VAL.C06VALH6 non-private approved analytics requestsNames/emails/free text/private data/acceptance dependencyInspect actual payloads and consent/blocker behavior; conversion only after durable acceptance, outage harmless
PH0.VAL.C07VALH7 actual disposable-validation location/permanence/resource checksProduction geography/publish approvalMatch existing North America approval or explicit exception; actual settings evidenced before H1; approved intent alone insufficient
PH0.VAL.C08VALH8 actual plan/history isolated restore/export/code-data compatibilityProduction destructive restore/zero-loss claimRecorded actual retention/history, recovered inquiries/intent and approved RPO/RTO proof objectives; safe replay limitations
PH0.VAL.C09VALH9 secret-use/staff access/MFA/environment proofPublic custom auth/real-secret dumpingInventory view/use privilege, scoped credentials, synthetic exposure and separation, rotation/recovery owners; no leakage
PH0.VAL.C10VALH10 representative CMS metadata/media exitProvider selection/rights-by-export assertionUsable content/media references/files, account/permission/cost and completeness limitations; reconstitution verified
PH0.VAL.C11VALH11 actual storage isolation/export/recovery if justified/selectedExtra service by default/venture shared bucketProject/environment/private-public/location/export boundaries; justified N/A if unselected, never false PASS
PH0.REVIEW.C01REVSeparate independent review of all eight candidate artifacts, queue and planning packageAppointment/self-ratification/implementationTrace requirements and cross-document conflicts; issue pass/gaps/fail/blocked findings; applicable explicit ratification/conditions separate
PH0.REVIEW.C02REVReconcile material proofs, decisions and affected architecture/spec versionsFramework race/freeze unsupported sectionsApplicable gates reviewed, open conditions held, provider/cost/ownership decisions recorded; direction-level vs full freeze explicit
PH1.PRESENT.C01UIApproved content-first application foundation and environment-safe buildFuture client/OS/auth/product expansionReviewed framework/version/build configuration; approved public/server boundaries; clean build/no secret exposure
PH1.PRESENT.C02UIResponsive primary/footer/mobile navigation and layoutEmpty Labs/Insights/Login/mandatory GPUExact destinations/order, keyboard/touch/focus/reflow; visible Music/business CTA; no hover-only path
PH1.PRESENT.C03UIHome/practice/about/legal/work/case-study/music templatesFabricated live proof/full artist EPKStructured contracts, three proof dimensions, English metadata/no-JS reading; absent media/proof does not fabricate content
PH1.PRESENT.C04UIAccessible practice-specific inquiry statesPublic uploads/accounts/browser persistence queueInvalid/loading/confirmed/ambiguous/unavailable states distinct; never success before actual durable-confirmation response
PH1.PUBLISH.C01PUBProtected approved-revision CMS previewPublic drafts/preview inquiry into productionAuthentication/cache/assets/noindex checked; actual approved revision stable; unauthorized edits excluded
PH1.PUBLISH.C02PUBSuccessful-only release build/promotion/provenanceAuto-publication permission/second CMS truthApp/content/assets/approval/time attributable; failed fetch/check retains last valid release; trigger replay safe
PH1.PUBLISH.C03PUBMedia availability/export/cache withdrawalUnjustified extra storage/private document vaultAPI vs CDN outages distinct; text/nav/intake useful; assets/export/corrective removal rights-valid
PH2.CONTENT.C01CNTActual company/offers/contact/privacy/legal/SEO copyInvented offers/guarantees/legal complianceSources/approvals per revision; real responder/contact and privacy practices; unsupported copy omitted/referred for approval
PH2.CONTENT.C02CNTActual Work/case-study materialVenture live-system connection/fake client resultsAccurate relationship/maturity/publication, permitted evidence/media/disclosure; withdrawal honored
PH2.CONTENT.C03CNTSmall approved Music proof/service materialLabel/DSP/exclusive/royalty authority assumptionsExact positioning/role/rights/asset/permission approval; no EPK or operations scope expansion
PH2.INTAKE.C01INQServer-validated bounded business/music contractUpload/login/automatic commercial commitmentInvalid/oversized/unsupported practice rejected, minimized approved fields and safe errors; client bypass harmless
PH2.INTAKE.C02INQAtomic accepted inquiry/required intent and reviewed identityPublic lookup/CRM/exactly-once promiseRollback/no false success; ambiguity/lost-response/concurrent duplicate/conflict tests satisfy actual policy
PH2.INTAKE.C03INQDurable recoverable dispatch trigger/retry/limitsPost-response fire-and-forget/custom message platformIdle/restart/replica/timeout/unknown outcome safely recovered; accepted data retained; bounded attempts/manual attention
PH2.INTAKE.C04INQRestricted minimal inspect/retry/disposition processBespoke admin/CRM sales stagesAuthorized staff find unresolved intent/acceptance safely, recover without duplicate effects; private access and audit
PH3.CONNECT.C01INTSelected email adapter and verified callbacksProvider events as inquiry truthRejection/timeout/signature/replay/duplicate/out-of-order/bounce safely correlated; acceptance invariant intact
PH3.CONNECT.C02INTApproved non-private analytics integrationInquiry payloads/mandatory tracking for acceptanceActual emitted requests inspected; conversion commit-linked, consent/blocker limits; unavailable analytics harmless
PH3.CONNECT.C03INTSelected shared anti-abuse integrationReplica-local authoritative enforcementConcurrent controls/legitimate network usability/provider outage policy; safe diagnostics and no fake success
PH3.CONNECT.C04INTOptional approved CRM minimal handoffCustom CRM/journal sales pipelineOwner adoption or explicit deferral; correlated retry/unknown result recovery; CRM outage never erases inquiry
PH3.CONNECT.C05INTOptional approved managed booking pathCustom scheduler/booking as acceptance truthOwner adoption or deferral; privacy/a11y/script and unavailable-vendor fallback; no false appointment
PH3.CONNECT.C06INTSafe health/intent/error alerts and response routePrivate payload logs/custom operational dashboardMissing/delayed dispatch and failures detectable, bounded duplicate alerts, responsible operator/backup and privacy
PH3.QUALITY.C01QAIntegrated WCAG/responsive/reduced-motion acceptanceCosmetic screenshot as conformance proofKeyboard/screen-reader/errors/focus/contrast/zoom/reflow/no-JS/motion checks on both practices and degraded states
PH3.QUALITY.C02QAPerformance/SEO/social/media budgetsLab metrics as adequate field proofMeasured JS/LCP/interaction/layout budgets, approved metadata/canonical/robots/media; actual limits and field follow-up
PH3.QUALITY.C03QAIntegrated headers/trust/abuse/preview/privacy/accessUnapproved risk waiver/new authSuccessful/error headers, secret/PII/draft/cache isolation, signed/replayed callbacks and shared abuse controls
PH3.QUALITY.C04QAIntegrated dependency outage/restore/replay drillsDestructive production test without authorityCMS/media/journal/email failure, failed build, ambiguous commits, restart/replica dispatch, coordinated restore/replay satisfy actual objectives
PH4.OPS.C01OPSActual privacy/processors/retention/access settingsTemplate legal certainty/default maximum claimLegal/Owner and staff access approvals; actual scoped roles/locations/retention/MFA/secrets boundaries
PH4.OPS.C02OPSOperating recovery/incident/response ownership/runbooksUnsupported RPO/RTO/zero-loss promiseNamed responsible/backup roles, response targets, actual recovery history/RPO/RTO/replay and alert/revocation rehearsal
PH4.OPS.C03OPSExact launch content/media/claim/release approvalAutomatic restoration of revoked proofApproved revision and all asset/relationship/legal permissions; correction/withdrawal plan, publisher/rights ownership
PH4.LAUNCH.C01LAUNCHProduction location preflight and explicit Owner go/no-goValidation region as production consentActual compute/DB/storage/pre-created/external processor locations, reviewed quality/ops/rights and specific first-publish authority
PH4.LAUNCH.C02LAUNCHControlled explicitly authorized first publicationDomain/provider/resources outside cutOnly approved release promoted; attributable provenance and safe rights-valid rollback/correction; no data reset
PH5.VERIFY.C01POSTActual public release/business/music inquiry verificationUnapproved real test PII/unbounded live trafficRoute/SEO/headers/approved revision, controlled accepted inquiries/intents/delivery and staff visibility verified
PH5.VERIFY.C02POSTField quality and operational follow-throughFabricated p75/traffic or treating email as responseAdequate observed field samples or explicit unproven limits, monitored intent recovery and actual responder/backup process
PH5.VERIFY.C03POSTIndependent launch review/operating handoffAutomatic next feature/OS/Phase expansionRequired evidence/major-phase acceptance, risk/condition ownership and follow-ups recorded; STOP

Current and historical state

Canonical source · v0.2 · SHA256
Path
docs/project-brain/03_PHASE_PARENT_CHILD_STRUCTURE.md
Status / authority
APPROVED — PASS WITH CONDITIONS — Owner S07 adopted planning contract; conditions held
SHA256
973806e41e2d91b323c56ad92d982c938833036ab65d609d7c4b63dd90c99000
Source
View canonical source · Download Markdown

Current and historical state

CURRENT: PHASE 0 / PH0.PLAN / BOOK.RATIFY.ONBOARD.2026-10-03. Master Edition v1.0 RATIFIED; onboarding PREPARED ONLY; all three AI roles NOT ACTIVATED. No new Child, technical authority or formal unit closure. The PH0.PLAN row's Book-status qualifier is normalized only; its scope, dependencies and acceptance/closure requirements are not reconsidered.

HISTORICAL — SUPERSEDED PLANNING-CUT STATE: PLAN.COMPLETE.2026-10-03 reported PH0 / PH0.PLAN / PH0.PLAN.C01. Its return ended REVIEW_PENDING and permission was consumed on delivery. That original disposition is not current Book state or role activation.

Historical source-gapped recovery/restoration contracts and H1 A–O evidence remain preserved in prior backups/ledger. Acceptance of v1.1-RC is a working continuity baseline, not retrospective independent closure or ratification of its roadmap/manual.

Owner Planning Disposition records Governor-assisted independent review and adoption PASS WITH CONDITIONS for the eight artifacts. PH0.REVIEW.C01 has a recorded disposition; formal unit closure is not asserted. No standing Governor, Execution or Review role is activated. Master Edition v1.0 is RATIFIED; planning adoption alone is not execution authority. The conditional Phase 0 window and later continuation cover current PH0.VAL.C01 / H1.LOCAL.PREPARE.2026-10-04. Exact local fixture has 45 passing author checks, not H1 acceptance. H1 remains BLOCKED on actual publishing/cost/review prerequisites, with published observations 0/0/0; no Child is newly created or CLOSED. Owner requests PH1–PH3/Governor collaboration, not proof of satisfied dependencies or activated roles.