YOU ARE HERE — Detailed brick-by-brick contracts
PH0 — Master planning, isolated validation and reviewed adoption decisions
PH0 · Master planning, isolated validation and reviewed adoption decisions REVIEW
- Id
- PH0
- Title
- Master planning, isolated validation and reviewed adoption decisions
- Dependencies
- Existing ratified sources and accepted recovery baseline
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- REVIEW
- Validation Status
- H1 BLOCKED; other technical proofs UNEXECUTED
- Authorization Status
- DOCUMENTARY CUT ONLY; no activation
- Status
- REVIEW
- Objective
- Adopted planning baseline and held material evidence/adoption decisions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
PH0.PLAN · Complete current eight-artifact planning program and handoff REVIEW_PENDING
- Id
- PH0.PLAN
- Title
- Complete current eight-artifact planning program and handoff
- Phase
- PH0
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- REVIEW_PENDING
- Validation Status
- AUTHOR CHECKS; OWNER ADOPTION RECORDED
- Authorization Status
- CONSUMED ON DELIVERY
- Status
- REVIEW_PENDING
- Objective Children
- Adopted master planning package / historical C01
- Dependencies
- Current Owner scope; governing sources; accepted baseline
- Acceptance Closure
- Eight artifacts delivered; Owner reports Governor-assisted review/adoption PASS WITH CONDITIONS; Book ratification recorded by Owner; formal unit closure remains pending, not author closure
PH0.PLAN.C01 · Eight-artifact planning program REVIEW_PENDING
- Id
- PH0.PLAN.C01
- Parent
- PH0.PLAN
- Phase
- PH0
- Title
- Eight-artifact planning program
- Dependencies
- Accepted v1.1-RC; current Owner documentary scope
- Readiness
- REVIEW_PENDING
- Status
- REVIEW_PENDING
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- REVIEW_PENDING
- Validation Status
- AUTHOR CHECKS ONLY
- Authorization Status
- CONSUMED ON DELIVERY
- Profile
- DOC
- Scope
- Current eight artifacts in specified order, queue, Brain/control view/handoff/report/new backup
- Non Scope
- Any proof/product/provider/ratification/activation
- Acceptance Failure Tests
- Full fields/traceability/consistent counts/statuses; resolved placeholders only; immutable source/prior backup integrity; missing evidence never PASS
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — DOC
- Areas Tests Failure
- Governing documents/derived mirrors/package; clause/scope/state/dependency/field/ID/anchor/hash consistency; conflict/missing proof/backup overwrite rejection
- Evidence Risks
- Source trace, audit, local static screenshots, manifests; REC-R02/04/05/06/07
- Recovery Reviewer
- Preserve immutable sources and prior backups; regenerate only derivatives; appointed independent Governor + applicable Owner acceptance
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Adopted master planning package / historical C01 | Current Owner scope; governing sources; accepted baseline | Eight artifacts delivered; Owner reports Governor-assisted review/adoption PASS WITH CONDITIONS; Book ratification recorded by Owner; formal unit closure remains pending, not author closure
PH0.VAL · Bounded material and conditional H1–H11 evidence BLOCKED
- Id
- PH0.VAL
- Title
- Bounded material and conditional H1–H11 evidence
- Phase
- PH0
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- BLOCKED
- Validation Status
- H1 BLOCKED; others UNEXECUTED
- Authorization Status
- NOT AUTHORIZED
- Status
- BLOCKED
- Objective Children
- Material and conditional evidence / C01–C11
- Dependencies
- Individual Technical Direction gate contracts, actual costs/environments and valid separate authority
- Acceptance Closure
- Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
PH0.VAL.C01 · H1 synthetic runtime proof BLOCKED
- Id
- PH0.VAL.C01
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H1 synthetic runtime proof
- Dependencies
- PH0.VAL.C07; actual publishing/cost/synthetic prerequisites
- Readiness
- BLOCKED
- Status
- BLOCKED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- BLOCKED
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H1 exact single synthetic route/island/POST/marker runtime and warm/idle measurements
- Non Scope
- Brand UI/real CMS/DB/data/secret/product/production
- Acceptance Failure Tests
- Technical Direction H1 mandatory checks and methodology; 20 initial warm/10 idle exploratory observations with limits; valid stop when publishing prerequisites absent
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H1
- Title
- Astro/selective React/Node runtime proof in separate synthetic disposable project
- Dependencies
- H7 validation geography → actual publishing/cost/synthetic environment verification
- Authorization Status
- NOT AUTHORIZED TO RESUME
- Execution Status
- BLOCKED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- BLOCKED
- Evidence
- A–O report, ZIP, raw preflight
- Condition
- Required bounded runtime suitability only; no production readiness/product/next gate/freeze
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C02 · H2 CMS/revision/preview/publication proof DRAFT
- Id
- PH0.VAL.C02
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H2 CMS/revision/preview/publication proof
- Dependencies
- G-SPEND; approved isolated CMS contract
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H2 CMS structured revisions/media/localization/preview/publication
- Non Scope
- Actual public product launch/selected-vendor inference
- Acceptance Failure Tests
- Draft/cache/assets isolated; approved revision traceable; published content survives API outage; failed build no promotion
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H2
- Title
- CMS choice / publication
- Dependencies
- Approved isolated proof; editor/content contract; account API/quotas/cost/processor review
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- None of required proof supplied
- Condition
- Structured content/revisions/media/localization, protected draft/preview/publication, outage preservation, release traceability/media dependency; informs CMS choice, not implementation/publication
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C03 · H3 journal/identity/outbox proof DRAFT
- Id
- PH0.VAL.C03
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H3 journal/identity/outbox proof
- Dependencies
- G-SPEND; approved isolated Data/Security contract
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H3 atomic journal/intent, safe identity/pooling/dispatch proof
- Non Scope
- CRM/schema product/production-data use
- Acceptance Failure Tests
- Commit before success; rollback/no orphan intent; ambiguous/concurrent retry and restart/republish/provider-failure recovery
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H3
- Title
- Journal / PostgreSQL / dispatch
- Dependencies
- Approved isolated proof; minimal atomic acceptance/intent contract; identity/privacy/access and pool/provider limits
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- None of required proof supplied
- Condition
- Commit-before-success, rollback/no false success, ambiguous commits, safe retry/dedup/concurrency, restart/republish persistence, atomic delivery intent and failure recovery, restricted inspection; informs journal/access design, not schema/CRM/product authority
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C04 · H4 email/events proof DRAFT
- Id
- PH0.VAL.C04
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H4 email/events proof
- Dependencies
- G-SPEND; approved domain/account and correlated intent contract
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H4 controlled email delivery/events with journal correlation
- Non Scope
- Real unsolicited messages/customer acceptance claim
- Acceptance Failure Tests
- Approved account/domain/SPF/DKIM/DMARC; rejection/timeout/bounce/retry/duplicate event visible; committed acceptance survives failure
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H4
- Title
- Transactional email
- Dependencies
- Approved controlled proof; account/domain ownership and SPF/DKIM/DMARC; correlated journal-ID delivery contract
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- None of required proof supplied
- Condition
- Rejection/timeout/retry/bounce/duplicate-event visibility and recovery; email cannot invalidate committed acceptance; informs provider design, not setup/spend/guarantees
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C05 · H5 shared anti-abuse proof DRAFT
- Id
- PH0.VAL.C05
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H5 shared anti-abuse proof
- Dependencies
- G-SPEND; approved payload/enforcement/failure policy
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H5 shared enforcement and legitimate-use proof
- Non Scope
- Memory-only global limiter/blanket bot lockout
- Acceptance Failure Tests
- Concurrent/replica-equivalent controls, bounded payloads, safe logs and dependency-failure policy; shared networks usable
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H5
- Title
- Anti-abuse / shared enforcement
- Dependencies
- Approved bounded proof; payload/control policy; concurrent/replica-equivalent methodology
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- None of required proof supplied
- Condition
- Bounded payload/shared enforcement, legitimate/shared-network usability, safe logs and dependency-failure policy; no memory-only shared limiter; informs controls, not product exposure
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C06 · H6 analytics privacy proof DRAFT
- Id
- PH0.VAL.C06
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H6 analytics privacy proof
- Dependencies
- G-SPEND; approved non-private events/processors
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H6 non-private approved analytics requests
- Non Scope
- Names/emails/free text/private data/acceptance dependency
- Acceptance Failure Tests
- Inspect actual payloads and consent/blocker behavior; conversion only after durable acceptance, outage harmless
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H6
- Title
- Privacy-appropriate analytics
- Dependencies
- Approved events/processor/cost/privacy configuration and proof
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- None of required proof supplied
- Condition
- Actual requests exclude names/emails/free text/private project/artist data; accepted conversion follows durable acceptance; consent/blocker limits; analytics outside transaction, not acceptance truth or publication permission
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C07 · H7 validation location verification DRAFT
- Id
- PH0.VAL.C07
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H7 validation location verification
- Dependencies
- Existing North America approval; actual disposable-resource verification
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- LIMITED DECISION; technical proof absent
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H7 actual disposable-validation location/permanence/resource checks
- Non Scope
- Production geography/publish approval
- Acceptance Failure Tests
- Match existing North America approval or explicit exception; actual settings evidenced before H1; approved intent alone insufficient
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H7
- Title
- Validation geography North America approval; production is separate
- Dependencies
- Explicit validation Owner decision before H1; actual location remains unverified
- Authorization Status
- Historical limited approval reported; NO CURRENT EXECUTION
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- H1 report A/B/O + preserved prerequisite doc
- Condition
- Limited validation location decision only; not production H7 closure
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C08 · H8 recovery/export compatibility proof DRAFT
- Id
- PH0.VAL.C08
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H8 recovery/export compatibility proof
- Dependencies
- G-SPEND; actual plan/history and approved proof objectives
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H8 actual plan/history isolated restore/export/code-data compatibility
- Non Scope
- Production destructive restore/zero-loss claim
- Acceptance Failure Tests
- Recorded actual retention/history, recovered inquiries/intent and approved RPO/RTO proof objectives; safe replay limitations
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H8
- Title
- Recovery / coordinated restore
- Dependencies
- Actual plan/default-configured retention/available history; approved isolated restore/export; Owner-approved RPO/RTO
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- Documentary plan baseline only; no actual restore proof
- Condition
- Recovered inquiries/intent, usable export, application/database compatibility and safe replay; informs recovery reliance, not zero loss/default maximum/production acceptance
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C09 · H9 staff/secrets boundary proof DRAFT
- Id
- PH0.VAL.C09
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H9 staff/secrets boundary proof
- Dependencies
- Approved synthetic exposure/access inventory and responsible roles
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H9 secret-use/staff access/MFA/environment proof
- Non Scope
- Public custom auth/real-secret dumping
- Acceptance Failure Tests
- Inventory view/use privilege, scoped credentials, synthetic exposure and separation, rotation/recovery owners; no leakage
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H9
- Title
- Secrets / staff access
- Dependencies
- Approved access inventory and synthetic exposure proof; accountable rotation/recovery owners
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- Historical existence-only preflight, not required access proof
- Condition
- Who views secrets or executes with them, MFA where available, scoped credentials, dev/production separation, exposure controls; not privilege grant or real-secret disclosure
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C10 · H10 content/media exit proof DRAFT
- Id
- PH0.VAL.C10
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H10 content/media exit proof
- Dependencies
- Approved representative CMS export contract
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H10 representative CMS metadata/media exit
- Non Scope
- Provider selection/rights-by-export assertion
- Acceptance Failure Tests
- Usable content/media references/files, account/permission/cost and completeness limitations; reconstitution verified
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H10
- Title
- CMS export / exit
- Dependencies
- Approved representative content/metadata/media proof; permissions/account ownership/cost review
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- None of required proof supplied
- Condition
- Complete usable export/recovery/migration format, media references/files and limitations; informs portability, not selected CMS/frozen architecture
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.VAL.C11 · H11 conditional storage proof DRAFT
- Id
- PH0.VAL.C11
- Parent
- PH0.VAL
- Phase
- PH0
- Title
- H11 conditional storage proof
- Dependencies
- G-OPTIONAL; selected-use justification and G-SPEND
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- CONDITIONAL; NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- VAL
- Scope
- H11 actual storage isolation/export/recovery if justified/selected
- Non Scope
- Extra service by default/venture shared bucket
- Acceptance Failure Tests
- Project/environment/private-public/location/export boundaries; justified N/A if unselected, never false PASS
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — VAL
- Areas Tests Failure
- Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases
- Evidence Risks
- Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14
- Recovery Reviewer
- Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS
Applicable validation gate
- Id
- H11
- Title
- Storage boundaries if selected
- Dependencies
- Explicit justified App Storage selection and approved actual ownership/location/access/export proof
- Authorization Status
- NOT AUTHORIZED
- Execution Status
- UNEXECUTED
- Validation Status
- NOT DEMONSTRATED
- Artifact Status
- RATIFIED GATE DEFINITION — NOT PROOF
- Status
- VALIDATION REQUIRED
- Evidence
- Project-scoped documentary baseline only
- Condition
- Project ownership/dev-production/public-private boundaries, actual location/export/recovery, no venture sharing; N/A only if later justified without adoption, never automatic PASS
PASS would establish only the bounded gate evidence in the canonical Technical Direction; it would NOT authorize another gate, Phase 1, product implementation or architecture freeze.
PH0.REVIEW · Independent planning review and evidence-based adoption REVIEW_PENDING
- Id
- PH0.REVIEW
- Title
- Independent planning review and evidence-based adoption
- Phase
- PH0
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- REVIEW_PENDING
- Validation Status
- PLANNING ADOPTION RECORDED; TECHNICAL ADOPTION PENDING
- Authorization Status
- NOT AUTHORIZED
- Status
- REVIEW_PENDING
- Objective Children
- Independent planning and adoption / C01–C02
- Dependencies
- Delivered planning; appointed independent function; applicable gate evidence
- Acceptance Closure
- Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation
PH0.REVIEW.C01 · Independent planning review and disposition REVIEW_PENDING
- Id
- PH0.REVIEW.C01
- Parent
- PH0.REVIEW
- Phase
- PH0
- Title
- Independent planning review and disposition
- Dependencies
- PH0.PLAN.C01 delivered v1.2-RC; current Owner disposition
- Readiness
- DISPOSITION RECORDED
- Status
- DISPOSITION RECORDED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- REVIEW_PENDING
- Validation Status
- OWNER-REPORTED GOVERNOR-ASSISTED REVIEW; PASS WITH CONDITIONS
- Authorization Status
- NOT AUTHORIZED FOR NEW EXECUTION
- Profile
- REV
- Scope
- Separate independent review of all eight candidate artifacts, queue and planning package
- Non Scope
- Appointment/self-ratification/implementation
- Acceptance Failure Tests
- Trace requirements and cross-document conflicts; issue pass/gaps/fail/blocked findings; applicable explicit ratification/conditions separate
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — REV
- Areas Tests Failure
- Planning/evidence/adoption records; full version review, contradictions, false authority and mandatory-gate gap assessment
- Evidence Risks
- Independently attributable review findings/disposition, not author assurance; REC-R02/04 and material AR risks
- Recovery Reviewer
- No implementation changes during review; preserve originals/correct under explicit rework; appointed independent Governor, applicable ratifier/Owner
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Independent planning and adoption / C01–C02 | Delivered planning; appointed independent function; applicable gate evidence | Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation
PH0.REVIEW.C02 · Technology/architecture adoption reconciliation DRAFT
- Id
- PH0.REVIEW.C02
- Parent
- PH0.REVIEW
- Phase
- PH0
- Title
- Technology/architecture adoption reconciliation
- Dependencies
- PH0.REVIEW.C01; applicable PH0.VAL evidence; G-SPEND
- Readiness
- VALIDATION REQUIRED
- Status
- VALIDATION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- MATERIAL DEPENDENCIES UNPROVEN
- Authorization Status
- NOT AUTHORIZED
- Profile
- REV
- Scope
- Reconcile material proofs, decisions and affected architecture/spec versions
- Non Scope
- Framework race/freeze unsupported sections
- Acceptance Failure Tests
- Applicable gates reviewed, open conditions held, provider/cost/ownership decisions recorded; direction-level vs full freeze explicit
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — REV
- Areas Tests Failure
- Planning/evidence/adoption records; full version review, contradictions, false authority and mandatory-gate gap assessment
- Evidence Risks
- Independently attributable review findings/disposition, not author assurance; REC-R02/04 and material AR risks
- Recovery Reviewer
- No implementation changes during review; preserve originals/correct under explicit rework; appointed independent Governor, applicable ratifier/Owner
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority
- Owner Gates
- Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval
- Exit Criteria
- Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit
Parent acceptance / dependency contract
Independent planning and adoption / C01–C02 | Delivered planning; appointed independent function; applicable gate evidence | Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation
PH1 — Public presentation and controlled publication foundation
PH1 · Public presentation and controlled publication foundation DRAFT
- Id
- PH1
- Title
- Public presentation and controlled publication foundation
- Dependencies
- PH0 applicable exit, G-PLAN, G-ARCH
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective
- Build approved public presentation/publication foundation
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
PH1.PRESENT · Accessible responsive public presentation DRAFT
- Id
- PH1.PRESENT
- Title
- Accessible responsive public presentation
- Phase
- PH1
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Accessible public presentation / C01–C04
- Dependencies
- G-PLAN/G-ARCH; approved Brand/Design/Data contracts
- Acceptance Closure
- Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PRESENT.C01 · Public application foundation DRAFT
- Id
- PH1.PRESENT.C01
- Parent
- PH1.PRESENT
- Phase
- PH1
- Title
- Public application foundation
- Dependencies
- G-PLAN; G-ARCH; PH0.REVIEW.C02
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- UI
- Scope
- Approved content-first application foundation and environment-safe build
- Non Scope
- Future client/OS/auth/product expansion
- Acceptance Failure Tests
- Reviewed framework/version/build configuration; approved public/server boundaries; clean build/no secret exposure
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — UI
- Areas Tests Failure
- Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
- Evidence Risks
- Screens/DOM/interaction/a11y/asset results; AR08/14/15
- Recovery Reviewer
- Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PRESENT.C02 · Responsive navigation/layout DRAFT
- Id
- PH1.PRESENT.C02
- Parent
- PH1.PRESENT
- Phase
- PH1
- Title
- Responsive navigation/layout
- Dependencies
- PH1.PRESENT.C01; reviewed Brand/Design
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- UI
- Scope
- Responsive primary/footer/mobile navigation and layout
- Non Scope
- Empty Labs/Insights/Login/mandatory GPU
- Acceptance Failure Tests
- Exact destinations/order, keyboard/touch/focus/reflow; visible Music/business CTA; no hover-only path
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — UI
- Areas Tests Failure
- Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
- Evidence Risks
- Screens/DOM/interaction/a11y/asset results; AR08/14/15
- Recovery Reviewer
- Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PRESENT.C03 · Public editorial/evidence templates DRAFT
- Id
- PH1.PRESENT.C03
- Parent
- PH1.PRESENT
- Phase
- PH1
- Title
- Public editorial/evidence templates
- Dependencies
- PH1.PRESENT.C02; reviewed content contracts
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- UI
- Scope
- Home/practice/about/legal/work/case-study/music templates
- Non Scope
- Fabricated live proof/full artist EPK
- Acceptance Failure Tests
- Structured contracts, three proof dimensions, English metadata/no-JS reading; absent media/proof does not fabricate content
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — UI
- Areas Tests Failure
- Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
- Evidence Risks
- Screens/DOM/interaction/a11y/asset results; AR08/14/15
- Recovery Reviewer
- Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PRESENT.C04 · Truthful inquiry/degraded interface DRAFT
- Id
- PH1.PRESENT.C04
- Parent
- PH1.PRESENT
- Phase
- PH1
- Title
- Truthful inquiry/degraded interface
- Dependencies
- PH1.PRESENT.C02; reviewed acceptance/identity contract
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- UI
- Scope
- Accessible practice-specific inquiry states
- Non Scope
- Public uploads/accounts/browser persistence queue
- Acceptance Failure Tests
- Invalid/loading/confirmed/ambiguous/unavailable states distinct; never success before actual durable-confirmation response
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — UI
- Areas Tests Failure
- Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states
- Evidence Risks
- Screens/DOM/interaction/a11y/asset results; AR08/14/15
- Recovery Reviewer
- Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure
PH1.PUBLISH · Protected approved-revision release/media pipeline DRAFT
- Id
- PH1.PUBLISH
- Title
- Protected approved-revision release/media pipeline
- Phase
- PH1
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Approved release resilience / C01–C03
- Dependencies
- CMS/preview/export evidence and presentation contracts
- Acceptance Closure
- Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure
PH1.PUBLISH.C01 · Protected revision preview DRAFT
- Id
- PH1.PUBLISH.C01
- Parent
- PH1.PUBLISH
- Phase
- PH1
- Title
- Protected revision preview
- Dependencies
- PH1.PRESENT.C03; PH0.VAL.C02; PH0.VAL.C09
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- PUB
- Scope
- Protected approved-revision CMS preview
- Non Scope
- Public drafts/preview inquiry into production
- Acceptance Failure Tests
- Authentication/cache/assets/noindex checked; actual approved revision stable; unauthorized edits excluded
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — PUB
- Areas Tests Failure
- CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal
- Evidence Risks
- Requests/build/media/provenance/export/removal evidence; AR02/07/10/16
- Recovery Reviewer
- Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure
PH1.PUBLISH.C02 · Checked release/promotion/provenance DRAFT
- Id
- PH1.PUBLISH.C02
- Parent
- PH1.PUBLISH
- Phase
- PH1
- Title
- Checked release/promotion/provenance
- Dependencies
- PH1.PUBLISH.C01; approved publication authority model
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- PUB
- Scope
- Successful-only release build/promotion/provenance
- Non Scope
- Auto-publication permission/second CMS truth
- Acceptance Failure Tests
- App/content/assets/approval/time attributable; failed fetch/check retains last valid release; trigger replay safe
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — PUB
- Areas Tests Failure
- CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal
- Evidence Risks
- Requests/build/media/provenance/export/removal evidence; AR02/07/10/16
- Recovery Reviewer
- Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure
PH1.PUBLISH.C03 · Media/CDN/export/withdrawal behavior DRAFT
- Id
- PH1.PUBLISH.C03
- Parent
- PH1.PUBLISH
- Phase
- PH1
- Title
- Media/CDN/export/withdrawal behavior
- Dependencies
- PH1.PUBLISH.C02; PH0.VAL.C10
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- PUB
- Scope
- Media availability/export/cache withdrawal
- Non Scope
- Unjustified extra storage/private document vault
- Acceptance Failure Tests
- API vs CDN outages distinct; text/nav/intake useful; assets/export/corrective removal rights-valid
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — PUB
- Areas Tests Failure
- CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal
- Evidence Risks
- Requests/build/media/provenance/export/removal evidence; AR02/07/10/16
- Recovery Reviewer
- Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut
- Owner Gates
- Approved brand direction, material dependency/spend; no production publish
- Exit Criteria
- Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted
Parent acceptance / dependency contract
Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure
PH2 — Approved content and reliable business/music intake
PH2 · Approved content and reliable business/music intake DRAFT
- Id
- PH2
- Title
- Approved content and reliable business/music intake
- Dependencies
- PH1 foundation; content/journal decisions
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective
- Populate truthful content and reliable practice-specific intake
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
PH2.CONTENT · Accurate approved company/work/music material DRAFT
- Id
- PH2.CONTENT
- Title
- Accurate approved company/work/music material
- Phase
- PH2
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- RIGHTS/CONTENT REQUIRED
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Factual approved public material / C01–C03
- Dependencies
- Actual sources/rights/approved copy and content contracts
- Acceptance Closure
- All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content
PH2.CONTENT.C01 · Company/offers/legal content DRAFT
- Id
- PH2.CONTENT.C01
- Parent
- PH2.CONTENT
- Phase
- PH2
- Title
- Company/offers/legal content
- Dependencies
- G-CONTENT; PH1.PUBLISH.C01
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- CONTENT APPROVAL REQUIRED
- Authorization Status
- NOT AUTHORIZED
- Profile
- CNT
- Scope
- Actual company/offers/contact/privacy/legal/SEO copy
- Non Scope
- Invented offers/guarantees/legal compliance
- Acceptance Failure Tests
- Sources/approvals per revision; real responder/contact and privacy practices; unsupported copy omitted/referred for approval
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — CNT
- Areas Tests Failure
- Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded
- Evidence Risks
- Exact item approval/source/permission, no fabricated evidence; AR07/13
- Recovery Reviewer
- Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content
PH2.CONTENT.C02 · Work/case-study proof DRAFT
- Id
- PH2.CONTENT.C02
- Parent
- PH2.CONTENT
- Phase
- PH2
- Title
- Work/case-study proof
- Dependencies
- G-CONTENT; PH1.PRESENT.C03
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- RIGHTS/FACTS REQUIRED
- Authorization Status
- NOT AUTHORIZED
- Profile
- CNT
- Scope
- Actual Work/case-study material
- Non Scope
- Venture live-system connection/fake client results
- Acceptance Failure Tests
- Accurate relationship/maturity/publication, permitted evidence/media/disclosure; withdrawal honored
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — CNT
- Areas Tests Failure
- Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded
- Evidence Risks
- Exact item approval/source/permission, no fabricated evidence; AR07/13
- Recovery Reviewer
- Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content
PH2.CONTENT.C03 · Curated Music proof DRAFT
- Id
- PH2.CONTENT.C03
- Parent
- PH2.CONTENT
- Phase
- PH2
- Title
- Curated Music proof
- Dependencies
- G-CONTENT; PH1.PRESENT.C03
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- RIGHTS/FACTS REQUIRED
- Authorization Status
- NOT AUTHORIZED
- Profile
- CNT
- Scope
- Small approved Music proof/service material
- Non Scope
- Label/DSP/exclusive/royalty authority assumptions
- Acceptance Failure Tests
- Exact positioning/role/rights/asset/permission approval; no EPK or operations scope expansion
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — CNT
- Areas Tests Failure
- Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded
- Evidence Risks
- Exact item approval/source/permission, no fabricated evidence; AR07/13
- Recovery Reviewer
- Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content
PH2.INTAKE · Atomic journal acceptance and recoverable delivery DRAFT
- Id
- PH2.INTAKE
- Title
- Atomic journal acceptance and recoverable delivery
- Phase
- PH2
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Durable qualified inquiry acceptance / C01–C04
- Dependencies
- H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts
- Acceptance Closure
- Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH2.INTAKE.C01 · Business/music server validation DRAFT
- Id
- PH2.INTAKE.C01
- Parent
- PH2.INTAKE
- Phase
- PH2
- Title
- Business/music server validation
- Dependencies
- PH1.PRESENT.C04; PH0.VAL.C03; approved minimum fields
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INQ
- Scope
- Server-validated bounded business/music contract
- Non Scope
- Upload/login/automatic commercial commitment
- Acceptance Failure Tests
- Invalid/oversized/unsupported practice rejected, minimized approved fields and safe errors; client bypass harmless
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INQ
- Areas Tests Failure
- Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
- Evidence Risks
- Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
- Recovery Reviewer
- Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH2.INTAKE.C02 · Atomic acceptance and safe retry identity DRAFT
- Id
- PH2.INTAKE.C02
- Parent
- PH2.INTAKE
- Phase
- PH2
- Title
- Atomic acceptance and safe retry identity
- Dependencies
- PH2.INTAKE.C01; reviewed H3 identity/commit policy
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INQ
- Scope
- Atomic accepted inquiry/required intent and reviewed identity
- Non Scope
- Public lookup/CRM/exactly-once promise
- Acceptance Failure Tests
- Rollback/no false success; ambiguity/lost-response/concurrent duplicate/conflict tests satisfy actual policy
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INQ
- Areas Tests Failure
- Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
- Evidence Risks
- Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
- Recovery Reviewer
- Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH2.INTAKE.C03 · Recoverable dispatch across idle/replicas DRAFT
- Id
- PH2.INTAKE.C03
- Parent
- PH2.INTAKE
- Phase
- PH2
- Title
- Recoverable dispatch across idle/replicas
- Dependencies
- PH2.INTAKE.C02; PH0.VAL.C04; approved activation mechanism
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INQ
- Scope
- Durable recoverable dispatch trigger/retry/limits
- Non Scope
- Post-response fire-and-forget/custom message platform
- Acceptance Failure Tests
- Idle/restart/replica/timeout/unknown outcome safely recovered; accepted data retained; bounded attempts/manual attention
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INQ
- Areas Tests Failure
- Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
- Evidence Risks
- Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
- Recovery Reviewer
- Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH2.INTAKE.C04 · Restricted staff inspection/recovery DRAFT
- Id
- PH2.INTAKE.C04
- Parent
- PH2.INTAKE
- Phase
- PH2
- Title
- Restricted staff inspection/recovery
- Dependencies
- PH2.INTAKE.C03; PH0.VAL.C09; G-OPS
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INQ
- Scope
- Restricted minimal inspect/retry/disposition process
- Non Scope
- Bespoke admin/CRM sales stages
- Acceptance Failure Tests
- Authorized staff find unresolved intent/acceptance safely, recover without duplicate effects; private access and audit
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INQ
- Areas Tests Failure
- Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests
- Evidence Risks
- Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15
- Recovery Reviewer
- Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1 affected contracts; approved content/fields; selected verified journal design
- Owner Gates
- Claims/rights/offers; permitted data/response ownership
- Exit Criteria
- Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted
Parent acceptance / dependency contract
Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM
PH3 — Integrations, quality and integrated failure/recovery assurance
PH3 · Integrations, quality and integrated failure/recovery assurance DRAFT
- Id
- PH3
- Title
- Integrations, quality and integrated failure/recovery assurance
- Dependencies
- PH1/PH2 affected interfaces
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective
- Integrate bounded services and establish end-to-end quality
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
PH3.CONNECT · Bounded provider integrations and observability DRAFT
- Id
- PH3.CONNECT
- Title
- Bounded provider integrations and observability
- Phase
- PH3
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Bounded services / C01–C06
- Dependencies
- Approved adapters/providers/cost/privacy; accepted intent contracts
- Acceptance Closure
- Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C01 · Email and verified callback integration DRAFT
- Id
- PH3.CONNECT.C01
- Parent
- PH3.CONNECT
- Phase
- PH3
- Title
- Email and verified callback integration
- Dependencies
- PH2.INTAKE.C03; PH0.VAL.C04
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INT
- Scope
- Selected email adapter and verified callbacks
- Non Scope
- Provider events as inquiry truth
- Acceptance Failure Tests
- Rejection/timeout/signature/replay/duplicate/out-of-order/bounce safely correlated; acceptance invariant intact
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INT
- Areas Tests Failure
- Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
- Evidence Risks
- Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
- Recovery Reviewer
- Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C02 · Non-private acceptance analytics DRAFT
- Id
- PH3.CONNECT.C02
- Parent
- PH3.CONNECT
- Phase
- PH3
- Title
- Non-private acceptance analytics
- Dependencies
- PH2.INTAKE.C02; PH0.VAL.C06; approved privacy config
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INT
- Scope
- Approved non-private analytics integration
- Non Scope
- Inquiry payloads/mandatory tracking for acceptance
- Acceptance Failure Tests
- Actual emitted requests inspected; conversion commit-linked, consent/blocker limits; unavailable analytics harmless
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INT
- Areas Tests Failure
- Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
- Evidence Risks
- Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
- Recovery Reviewer
- Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C03 · Shared intake anti-abuse controls DRAFT
- Id
- PH3.CONNECT.C03
- Parent
- PH3.CONNECT
- Phase
- PH3
- Title
- Shared intake anti-abuse controls
- Dependencies
- PH2.INTAKE.C01; PH0.VAL.C05
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INT
- Scope
- Selected shared anti-abuse integration
- Non Scope
- Replica-local authoritative enforcement
- Acceptance Failure Tests
- Concurrent controls/legitimate network usability/provider outage policy; safe diagnostics and no fake success
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INT
- Areas Tests Failure
- Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
- Evidence Risks
- Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
- Recovery Reviewer
- Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C04 · Conditional CRM handoff DRAFT
- Id
- PH3.CONNECT.C04
- Parent
- PH3.CONNECT
- Phase
- PH3
- Title
- Conditional CRM handoff
- Dependencies
- G-OPTIONAL; PH2.INTAKE.C03
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- CONDITIONAL; UNPROVEN
- Authorization Status
- NOT AUTHORIZED
- Profile
- INT
- Scope
- Optional approved CRM minimal handoff
- Non Scope
- Custom CRM/journal sales pipeline
- Acceptance Failure Tests
- Owner adoption or explicit deferral; correlated retry/unknown result recovery; CRM outage never erases inquiry
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INT
- Areas Tests Failure
- Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
- Evidence Risks
- Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
- Recovery Reviewer
- Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C05 · Conditional managed booking DRAFT
- Id
- PH3.CONNECT.C05
- Parent
- PH3.CONNECT
- Phase
- PH3
- Title
- Conditional managed booking
- Dependencies
- G-OPTIONAL; PH1.PRESENT.C02
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- CONDITIONAL; UNPROVEN
- Authorization Status
- NOT AUTHORIZED
- Profile
- INT
- Scope
- Optional approved managed booking path
- Non Scope
- Custom scheduler/booking as acceptance truth
- Acceptance Failure Tests
- Owner adoption or deferral; privacy/a11y/script and unavailable-vendor fallback; no false appointment
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INT
- Areas Tests Failure
- Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
- Evidence Risks
- Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
- Recovery Reviewer
- Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.CONNECT.C06 · Safe operational monitoring/alerts DRAFT
- Id
- PH3.CONNECT.C06
- Parent
- PH3.CONNECT
- Phase
- PH3
- Title
- Safe operational monitoring/alerts
- Dependencies
- PH2.INTAKE.C04; approved incident/alert ownership
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Profile
- INT
- Scope
- Safe health/intent/error alerts and response route
- Non Scope
- Private payload logs/custom operational dashboard
- Acceptance Failure Tests
- Missing/delayed dispatch and failures detectable, bounded duplicate alerts, responsible operator/backup and privacy
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — INT
- Areas Tests Failure
- Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests
- Evidence Risks
- Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14
- Recovery Reviewer
- Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion
PH3.QUALITY · Integrated accessibility/performance/security/recovery DRAFT
- Id
- PH3.QUALITY
- Title
- Integrated accessibility/performance/security/recovery
- Phase
- PH3
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- PENDING VALIDATION
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Integrated quality and failure assurance / C01–C04
- Dependencies
- Relevant implementation/integration/content; actual test environment
- Acceptance Closure
- Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH3.QUALITY.C01 · Accessibility/responsive acceptance DRAFT
- Id
- PH3.QUALITY.C01
- Parent
- PH3.QUALITY
- Phase
- PH3
- Title
- Accessibility/responsive acceptance
- Dependencies
- PH1.PRESENT.C03; PH1.PRESENT.C04; PH2.INTAKE.C01
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- QA
- Scope
- Integrated WCAG/responsive/reduced-motion acceptance
- Non Scope
- Cosmetic screenshot as conformance proof
- Acceptance Failure Tests
- Keyboard/screen-reader/errors/focus/contrast/zoom/reflow/no-JS/motion checks on both practices and degraded states
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — QA
- Areas Tests Failure
- Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
- Evidence Risks
- Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
- Recovery Reviewer
- Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH3.QUALITY.C02 · Performance/SEO/media hardening DRAFT
- Id
- PH3.QUALITY.C02
- Parent
- PH3.QUALITY
- Phase
- PH3
- Title
- Performance/SEO/media hardening
- Dependencies
- PH1.PUBLISH.C03; PH3.CONNECT.C02; approved launch material
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- QA
- Scope
- Performance/SEO/social/media budgets
- Non Scope
- Lab metrics as adequate field proof
- Acceptance Failure Tests
- Measured JS/LCP/interaction/layout budgets, approved metadata/canonical/robots/media; actual limits and field follow-up
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — QA
- Areas Tests Failure
- Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
- Evidence Risks
- Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
- Recovery Reviewer
- Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH3.QUALITY.C03 · Integrated security/access/privacy assurance DRAFT
- Id
- PH3.QUALITY.C03
- Parent
- PH3.QUALITY
- Phase
- PH3
- Title
- Integrated security/access/privacy assurance
- Dependencies
- PH3.CONNECT.C01; PH3.CONNECT.C03; PH1.PUBLISH.C01
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- QA
- Scope
- Integrated headers/trust/abuse/preview/privacy/access
- Non Scope
- Unapproved risk waiver/new auth
- Acceptance Failure Tests
- Successful/error headers, secret/PII/draft/cache isolation, signed/replayed callbacks and shared abuse controls
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — QA
- Areas Tests Failure
- Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
- Evidence Risks
- Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
- Recovery Reviewer
- Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH3.QUALITY.C04 · Integrated outage/restore/replay assurance DRAFT
- Id
- PH3.QUALITY.C04
- Parent
- PH3.QUALITY
- Phase
- PH3
- Title
- Integrated outage/restore/replay assurance
- Dependencies
- PH0.VAL.C08; PH3.CONNECT.C06; PH3.CONNECT.C01; PH1.PUBLISH.C02
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- QA
- Scope
- Integrated dependency outage/restore/replay drills
- Non Scope
- Destructive production test without authority
- Acceptance Failure Tests
- CMS/media/journal/email failure, failed build, ambiguous commits, restart/replica dispatch, coordinated restore/replay satisfy actual objectives
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — QA
- Areas Tests Failure
- Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements
- Evidence Risks
- Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16
- Recovery Reviewer
- Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH1/PH2 interfaces; approved provider/cost/privacy contracts
- Owner Gates
- Conditional CRM/booking; material risk/cost/processor exceptions
- Exit Criteria
- Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference
Parent acceptance / dependency contract
Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver
PH4 — Operational/production readiness and explicitly approved launch
PH4 · Operational/production readiness and explicitly approved launch DRAFT
- Id
- PH4
- Title
- Operational/production readiness and explicitly approved launch
- Dependencies
- PH3 accepted readiness; G-OPS/G-CONTENT/G-LAUNCH
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective
- Confirm operations, production location and controlled launch
- Entry Conditions
- PH3 readiness; approved actual release/rights, operating owners and recovery
- Owner Gates
- Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
- Exit Criteria
- Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
PH4.OPS · Actual operating/legal/access/recovery readiness DRAFT
- Id
- PH4.OPS
- Title
- Actual operating/legal/access/recovery readiness
- Phase
- PH4
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Actual operational readiness / C01–C03
- Dependencies
- Quality/recovery/content evidence, G-OPS
- Acceptance Closure
- Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals
PH4.OPS.C01 · Actual access/privacy/processor readiness DRAFT
- Id
- PH4.OPS.C01
- Parent
- PH4.OPS
- Phase
- PH4
- Title
- Actual access/privacy/processor readiness
- Dependencies
- PH3.QUALITY.C03; G-OPS
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- OPS
- Scope
- Actual privacy/processors/retention/access settings
- Non Scope
- Template legal certainty/default maximum claim
- Acceptance Failure Tests
- Legal/Owner and staff access approvals; actual scoped roles/locations/retention/MFA/secrets boundaries
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — OPS
- Areas Tests Failure
- Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure
- Evidence Risks
- Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14
- Recovery Reviewer
- Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH3 readiness; approved actual release/rights, operating owners and recovery
- Owner Gates
- Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
- Exit Criteria
- Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
Parent acceptance / dependency contract
Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals
PH4.OPS.C02 · Recovery/incident/responding runbooks DRAFT
- Id
- PH4.OPS.C02
- Parent
- PH4.OPS
- Phase
- PH4
- Title
- Recovery/incident/responding runbooks
- Dependencies
- PH3.QUALITY.C04; G-OPS
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- OPS
- Scope
- Operating recovery/incident/response ownership/runbooks
- Non Scope
- Unsupported RPO/RTO/zero-loss promise
- Acceptance Failure Tests
- Named responsible/backup roles, response targets, actual recovery history/RPO/RTO/replay and alert/revocation rehearsal
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — OPS
- Areas Tests Failure
- Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure
- Evidence Risks
- Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14
- Recovery Reviewer
- Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH3 readiness; approved actual release/rights, operating owners and recovery
- Owner Gates
- Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
- Exit Criteria
- Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
Parent acceptance / dependency contract
Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals
PH4.OPS.C03 · Final approved rights/content/release DRAFT
- Id
- PH4.OPS.C03
- Parent
- PH4.OPS
- Phase
- PH4
- Title
- Final approved rights/content/release
- Dependencies
- PH2.CONTENT.C01; PH2.CONTENT.C02; PH2.CONTENT.C03; PH1.PUBLISH.C03
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- RELEASE APPROVAL REQUIRED
- Authorization Status
- NOT AUTHORIZED
- Profile
- OPS
- Scope
- Exact launch content/media/claim/release approval
- Non Scope
- Automatic restoration of revoked proof
- Acceptance Failure Tests
- Approved revision and all asset/relationship/legal permissions; correction/withdrawal plan, publisher/rights ownership
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — OPS
- Areas Tests Failure
- Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure
- Evidence Risks
- Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14
- Recovery Reviewer
- Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH3 readiness; approved actual release/rights, operating owners and recovery
- Owner Gates
- Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
- Exit Criteria
- Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
Parent acceptance / dependency contract
Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals
PH4.LAUNCH · Owner-controlled geography/first publish/release DRAFT
- Id
- PH4.LAUNCH
- Title
- Owner-controlled geography/first publish/release
- Phase
- PH4
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Explicitly controlled publication / C01–C02
- Dependencies
- OPS and QUALITY required closure; G-LAUNCH
- Acceptance Closure
- Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference
PH4.LAUNCH.C01 · Production geography and launch authorization DRAFT
- Id
- PH4.LAUNCH.C01
- Parent
- PH4.LAUNCH
- Phase
- PH4
- Title
- Production geography and launch authorization
- Dependencies
- PH4.OPS.C01; PH4.OPS.C02; PH4.OPS.C03; PH3.QUALITY.C01; PH3.QUALITY.C02
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- H7 PRODUCTION DISTINCT
- Authorization Status
- NOT AUTHORIZED
- Profile
- LAUNCH
- Scope
- Production location preflight and explicit Owner go/no-go
- Non Scope
- Validation region as production consent
- Acceptance Failure Tests
- Actual compute/DB/storage/pre-created/external processor locations, reviewed quality/ops/rights and specific first-publish authority
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — LAUNCH
- Areas Tests Failure
- Actual location/release/production transition; preflight, go/no-go, approved promotion and rollback/removal cases
- Evidence Risks
- Explicit Owner authority/location/quality/release/operating readiness; AR07/11/12/13/16
- Recovery Reviewer
- Safe rights-valid rollback/correction; protect accepted data, destructive effects separately authorized; Owner + designated release reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH3 readiness; approved actual release/rights, operating owners and recovery
- Owner Gates
- Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
- Exit Criteria
- Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
Parent acceptance / dependency contract
Explicitly controlled publication / C01–C02 | OPS and QUALITY required closure; G-LAUNCH | Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference
PH4.LAUNCH.C02 · Authorized controlled first publish DRAFT
- Id
- PH4.LAUNCH.C02
- Parent
- PH4.LAUNCH
- Phase
- PH4
- Title
- Authorized controlled first publish
- Dependencies
- PH4.LAUNCH.C01; G-LAUNCH; reviewed release/rollback evidence
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- LAUNCH
- Scope
- Controlled explicitly authorized first publication
- Non Scope
- Domain/provider/resources outside cut
- Acceptance Failure Tests
- Only approved release promoted; attributable provenance and safe rights-valid rollback/correction; no data reset
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — LAUNCH
- Areas Tests Failure
- Actual location/release/production transition; preflight, go/no-go, approved promotion and rollback/removal cases
- Evidence Risks
- Explicit Owner authority/location/quality/release/operating readiness; AR07/11/12/13/16
- Recovery Reviewer
- Safe rights-valid rollback/correction; protect accepted data, destructive effects separately authorized; Owner + designated release reviewer
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- PH3 readiness; approved actual release/rights, operating owners and recovery
- Owner Gates
- Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates
- Exit Criteria
- Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved
Parent acceptance / dependency contract
Explicitly controlled publication / C01–C02 | OPS and QUALITY required closure; G-LAUNCH | Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference
PH5 — Post-launch verification and operating handoff
PH5 · Post-launch verification and operating handoff DRAFT
- Id
- PH5
- Title
- Post-launch verification and operating handoff
- Dependencies
- Authorized PH4 launch
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective
- Verify actual launch and continued operations
- Entry Conditions
- Authorized PH4 release; controlled production verification authority
- Owner Gates
- Residual significant risk and major-phase/launch acceptance
- Exit Criteria
- Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded
PH5.VERIFY · Actual public behavior and operating follow-through DRAFT
- Id
- PH5.VERIFY
- Title
- Actual public behavior and operating follow-through
- Phase
- PH5
- Artifact Status
- APPROVED PLANNING CONTRACT
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Status
- DRAFT
- Objective Children
- Post-launch proof and acceptance / C01–C03
- Dependencies
- Published approved release and verification authority
- Acceptance Closure
- Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance
PH5.VERIFY.C01 · Public release and inquiry smoke verification DRAFT
- Id
- PH5.VERIFY.C01
- Parent
- PH5.VERIFY
- Phase
- PH5
- Title
- Public release and inquiry smoke verification
- Dependencies
- PH4.LAUNCH.C02; authorized controlled production test data
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- POST
- Scope
- Actual public release/business/music inquiry verification
- Non Scope
- Unapproved real test PII/unbounded live traffic
- Acceptance Failure Tests
- Route/SEO/headers/approved revision, controlled accepted inquiries/intents/delivery and staff visibility verified
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — POST
- Areas Tests Failure
- Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic
- Evidence Risks
- Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16
- Recovery Reviewer
- Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Authorized PH4 release; controlled production verification authority
- Owner Gates
- Residual significant risk and major-phase/launch acceptance
- Exit Criteria
- Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded
Parent acceptance / dependency contract
Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance
PH5.VERIFY.C02 · Field/operational follow-through DRAFT
- Id
- PH5.VERIFY.C02
- Parent
- PH5.VERIFY
- Phase
- PH5
- Title
- Field/operational follow-through
- Dependencies
- PH5.VERIFY.C01; adequate actual observations and assigned operators
- Readiness
- DEPENDENCY UNSATISFIED
- Status
- DEPENDENCY UNSATISFIED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- NOT DEMONSTRATED
- Authorization Status
- NOT AUTHORIZED
- Profile
- POST
- Scope
- Field quality and operational follow-through
- Non Scope
- Fabricated p75/traffic or treating email as response
- Acceptance Failure Tests
- Adequate observed field samples or explicit unproven limits, monitored intent recovery and actual responder/backup process
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — POST
- Areas Tests Failure
- Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic
- Evidence Risks
- Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16
- Recovery Reviewer
- Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Authorized PH4 release; controlled production verification authority
- Owner Gates
- Residual significant risk and major-phase/launch acceptance
- Exit Criteria
- Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded
Parent acceptance / dependency contract
Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance
PH5.VERIFY.C03 · Launch review and operating handoff DRAFT
- Id
- PH5.VERIFY.C03
- Parent
- PH5.VERIFY
- Phase
- PH5
- Title
- Launch review and operating handoff
- Dependencies
- PH5.VERIFY.C01; PH5.VERIFY.C02; Owner major-phase acceptance
- Readiness
- OWNER DECISION REQUIRED
- Status
- OWNER DECISION REQUIRED
- Artifact Status
- APPROVED PLANNING CONTRACT — CONDITIONS HELD
- Execution Status
- DRAFT
- Validation Status
- REVIEW REQUIRED
- Authorization Status
- NOT AUTHORIZED
- Profile
- POST
- Scope
- Independent launch review/operating handoff
- Non Scope
- Automatic next feature/OS/Phase expansion
- Acceptance Failure Tests
- Required evidence/major-phase acceptance, risk/condition ownership and follow-ups recorded; STOP
- Contract Source
- 03_PHASE_PARENT_CHILD_STRUCTURE.md: row + profile + common contract; 02 dependency/status row
- Technical Cut
- PENDING VALIDATION / DEPENDENCY UNSATISFIED
Named normative test / evidence / risk / recovery / reviewer profile — POST
- Areas Tests Failure
- Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic
- Evidence Risks
- Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16
- Recovery Reviewer
- Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance
Inherited Child requirements (apply together with this row and status/dependency row)
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Phase entry / Owner gates / exit conditions
- Entry Conditions
- Authorized PH4 release; controlled production verification authority
- Owner Gates
- Residual significant risk and major-phase/launch acceptance
- Exit Criteria
- Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded
Parent acceptance / dependency contract
Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance
PHASE / PARENT / CHILD STRUCTURE v0.2 — APPROVED PLANNING BASELINE
PHASE / PARENT / CHILD STRUCTURE v0.2 — APPROVED PLANNING BASELINE
Phase 0 · 3 October 2026 · Owner adoption: PASS WITH CONDITIONS · NOT ACTIVATED
Sources: Master Planning Completion §10; Constitution VI/VII/IX/XV; Technical Direction H; Architecture §24; five preceding specifications and Roadmap v0.2. Owner Planning Disposition §§1/4 adopts these contracts as the official planning decomposition, with open conditions held. Planning approval is not operational activation.
PROJECT → PHASE → PARENT → CHILD → EXECUTION CUT → IMPLEMENTATION / ANALYSIS → TESTING → EVIDENCE → REVIEW → CLOSURE.
There are 6 approved planning Phases, 12 Parents and 46 Children. H1 historical cut IDs remain history, not retroactively renamed. PH0.PLAN.C01 records the original documentary program; the separately Owner-authorized Book cut is associated with PH0.PLAN for reporting only and does not add or activate a roadmap Child. No future Child has execution authority.
Phase contracts
Phase contracts
| Phase | Objective | Entry / dependencies | Parents | Owner gates | Exit criteria |
|---|---|---|---|---|---|
| PH0 | Adopted planning baseline and held material evidence/adoption decisions | Ratified Constitution/Direction; accepted recovery baseline; current Owner adoption with conditions; valid separately bounded proof authority | PH0.PLAN, PH0.VAL, PH0.REVIEW | Planning conditions/delegation; proof cost/environment; material architecture decisions; Phase 1 approval | Owner planning adoption recorded; applicable architecture/proof evidence and conditional/staged holds reviewed; explicit Owner phase disposition; no self-freeze or automatic exit |
| PH1 | Build approved public presentation/publication foundation | PH0 applicable exit; G-PLAN/G-ARCH; explicit implementation cut | PH1.PRESENT, PH1.PUBLISH | Approved brand direction, material dependency/spend; no production publish | Responsive semantic templates and truthful states; protected preview/revision promotion/media behavior verified; required Parents accepted |
| PH2 | Populate truthful content and reliable practice-specific intake | PH1 affected contracts; approved content/fields; selected verified journal design | PH2.CONTENT, PH2.INTAKE | Claims/rights/offers; permitted data/response ownership | Approved revision-bound content; atomic acceptance/intent, identity, dispatch and restricted recovery evidence accepted |
| PH3 | Integrate bounded services and establish end-to-end quality | PH1/PH2 interfaces; approved provider/cost/privacy contracts | PH3.CONNECT, PH3.QUALITY | Conditional CRM/booking; material risk/cost/processor exceptions | Required integrations and quality/failure/recovery tests accepted; conditional paths explicitly dispositioned; no launch inference |
| PH4 | Confirm operations, production location and controlled launch | PH3 readiness; approved actual release/rights, operating owners and recovery | PH4.OPS, PH4.LAUNCH | Actual privacy/RPO/RTO/cost/owners; H7 production; first publication/launch/destructive gates | Explicit launch authority; authorized publish verified; recovery/corrective-publication readiness and operating handoff inputs preserved |
| PH5 | Verify actual launch and continued operations | Authorized PH4 release; controlled production verification authority | PH5.VERIFY | Residual significant risk and major-phase/launch acceptance | Public/inquiry/operational checks, measured field limitations and follow-ups reviewed; Owner acceptance recorded |
Phase non-scope everywhere: public auth/uploads/AI/client OS/custom CRM/custom admin/royalty/distribution backend, venture coupling and unapproved product scope. Phase risks are inherited from contained profiles below and 09 Risk Register; entries never assume vendor, production location or final business content. Later operational settings may be verified closer to reliance under Architecture §23.3, but held dependencies remain explicit and unpassed.
Parent contracts
Parent contracts
Children suffixes below expand under the exact Parent prefix; e.g. C01–C04 means four unique IDs, not a new composite unit.
| Parent | Objective / Children | Dependencies | Acceptance / closure conditions |
|---|---|---|---|
| PH0.PLAN | Adopted master planning package / historical C01 | Current Owner scope; governing sources; accepted baseline | Eight artifacts delivered; Owner reports Governor-assisted review/adoption PASS WITH CONDITIONS; Book ratification recorded by Owner; formal unit closure remains pending, not author closure |
| PH0.VAL | Material and conditional evidence / C01–C11 | Individual Technical Direction gate contracts, actual costs/environments and valid separate authority | Each applicable gate adequately evidenced/reviewed; conditional/staged disposition explicit; no missing proof PASS |
| PH0.REVIEW | Independent planning and adoption / C01–C02 | Delivered planning; appointed independent function; applicable gate evidence | Explicit versioned review/ratification/adoption records, unresolved held dependencies named, Owner-reserved approvals; no implied implementation |
| PH1.PRESENT | Accessible public presentation / C01–C04 | G-PLAN/G-ARCH; approved Brand/Design/Data contracts | Required templates/nav/forms/states pass semantic/mobile/no-JS/acceptance-interface checks; reviewer closure |
| PH1.PUBLISH | Approved release resilience / C01–C03 | CMS/preview/export evidence and presentation contracts | Protected revision approval, successful-only promotion, provenance and outage/withdrawal behavior; reviewer closure |
| PH2.CONTENT | Factual approved public material / C01–C03 | Actual sources/rights/approved copy and content contracts | All intended release items approved per revision/use; missing optional proof omitted honestly; rights withdrawal pathway; no fabricated content |
| PH2.INTAKE | Durable qualified inquiry acceptance / C01–C04 | H3/H4/H9 and approved minimal input/identity/dispatch/staff contracts | Atomic commit/no false success, safe retries, restart/replica delivery visibility and restricted recovery; not CRM |
| PH3.CONNECT | Bounded services / C01–C06 | Approved adapters/providers/cost/privacy; accepted intent contracts | Required email/analytics/abuse/monitoring behavior verified; CRM/booking explicit adoption or reviewed deferral; no product expansion |
| PH3.QUALITY | Integrated quality and failure assurance / C01–C04 | Relevant implementation/integration/content; actual test environment | Mandatory accessibility/performance/security/outage/restore evidence, limitations and significant residual-risk disposition; no mandatory waiver |
| PH4.OPS | Actual operational readiness / C01–C03 | Quality/recovery/content evidence, G-OPS | Legal/privacy/access/location/response/recovery/rights/ownership runbooks and actual approved release; Owner-required approvals |
| PH4.LAUNCH | Explicitly controlled publication / C01–C02 | OPS and QUALITY required closure; G-LAUNCH | Actual production H7, first-publish/launch authority, checked promotion and rollback/withdrawal readiness; Owner consent not roadmap inference |
| PH5.VERIFY | Post-launch proof and acceptance / C01–C03 | Published approved release and verification authority | Actual behavior and staff follow-through, sufficient field observations or explicit limitations, assigned follow-ups and Owner major-phase acceptance |
Every Parent closes only after each required Child is explicitly accepted/closed, mandatory criteria evidenced and its designated reviewer approves Parent acceptance. Conditional deferral/N/A must be justified and reviewed; no optional Child is falsely CLOSED or gate marked PASS. A Parent's approval never authorizes a Child.
Complete inherited Child contract
Complete inherited Child contract
Each Child is defined by its row below + matching dependency/status row in 02 + its named profile + this common contract. These references are normative, not blank implementation templates.
- Unique ID / Parent / Phase: row ID; Parent = prefix before
.C; Phase = prefix before first dot. - Objective/scope/non-scope: explicit row outcome/scope and excluded outcome, plus ratified V1 exclusions. No scope inferred from a profile.
- Dependencies: exact matching 02 row and any named G-symbol; a discrepancy is STOP, not permission to choose easier wording.
- Prerequisites: relevant Phase entry, applicable reviewed source/spec versions, satisfied evidence dependencies, appointed reviewer, actual permitted environment/data/cost and fresh explicit cut authority. Framework-neutral contract does not supply provider/version details.
- Affected system areas: profile's conceptual areas restricted by row scope; the future cut must identify actual files/services once selection is reviewed.
- Acceptance/tests: all row-specific acceptance/failure cases and profile tests; instantiate actual commands/samples/expected results in the bounded cut before execution.
- Evidence: profile outputs connecting row requirements→tests→observations; version/ID/environment/date/method/limitations/hash, no secrets/private payload dumps.
- Failure paths/risks: row cases, profile risks and missing authority/evidence, source conflict, material change, cost/data leakage or unsafe recovery. Enter BLOCKED/STOP, do not fake acceptance.
- Rollback/recovery: profile method plus preserve source/evidence; distinguish code/release rollback from persistent/external state. Destructive restoration/replay requires separate relevant authority.
- Definition of Done: complete row scope and mandatory tests/evidence; no failed mandatory requirement; reviewed gaps/conditions and cleanup where appropriate; state/registers/handoff updated. Author completion normally ends REVIEW_PENDING.
- Reviewer: profile's required separate designated function; independent where required, explicitly appointed/delegated. No reviewer is appointed here. Owner-reserved matters remain Owner's.
- Closure: explicit designated acceptance, required Owner approval, mandatory evidence and properly authorized cleanup; XV.3. Missing reviewer/authority means no closure.
- Next permitted state: DRAFT→REVIEW→READY after reviewed definition/prerequisites, never automatically AUTHORIZED. Authorized performed work→REVIEW_PENDING→CLOSED only on acceptance. BLOCKED/DEFERRED/CANCELLED require recorded disposition. Every completed cut ends STOP; next cut needs separate valid authority.
- Technical cut readiness: all unperformed proofs/implementation/production details remain DEPENDENCY UNSATISFIED / PENDING VALIDATION until actual versions/tools/policies/authority are evidenced. Planning completeness does not manufacture them.
Test / evidence / risk / recovery / reviewer profiles
Test / evidence / risk / recovery / reviewer profiles
| Profile | Affected areas / tests and failure paths | Evidence and risks | Recovery awareness / required reviewer |
|---|---|---|---|
| DOC | Governing documents/derived mirrors/package; clause/scope/state/dependency/field/ID/anchor/hash consistency; conflict/missing proof/backup overwrite rejection | Source trace, audit, local static screenshots, manifests; REC-R02/04/05/06/07 | Preserve immutable sources and prior backups; regenerate only derivatives; appointed independent Governor + applicable Owner acceptance |
| VAL | Only approved isolated gate surface; full matching Technical Direction H gate contract, bounded synthetic tests and mandatory failure/measurement cases | Actual gate outputs/methodology/samples/limitations and disposable evidence; AR01–06/09/11/12/14 | Accepted evidence before authorized cleanup; never production fallback/real data by inference; designated independent validation reviewer, Owner-reserved conditions |
| REV | Planning/evidence/adoption records; full version review, contradictions, false authority and mandatory-gate gap assessment | Independently attributable review findings/disposition, not author assurance; REC-R02/04 and material AR risks | No implementation changes during review; preserve originals/correct under explicit rework; appointed independent Governor, applicable ratifier/Owner |
| UI | Public templates/nav/form presentation; keyboard/touch/reading order/zoom/reflow/no-JS, errors/loading/ambiguous/degraded states | Screens/DOM/interaction/a11y/asset results; AR08/14/15 | Bounded code/release rollback without erasing inquiries; designated design/accessibility/acceptance reviewer |
| PUB | CMS adapter/preview/build/assets/release; draft/cache isolation, pinned approved revision, failed build/outage/export/withdrawal | Requests/build/media/provenance/export/removal evidence; AR02/07/10/16 | Rights-valid prior release or corrective release; escalate failed removal, do not blindly restore revoked assets; designated publication/security/rights reviewer |
| CNT | Actual public content/rights/metadata; item-source/claim/use/expiry/revision/three-dimension checks, unsupported blocks excluded | Exact item approval/source/permission, no fabricated evidence; AR07/13 | Withdraw/correct permitted material through approved publisher; factual/rights approver and Owner-reserved commercial/legal approval |
| INQ | Server validation/journal/intent/identity/dispatch/restricted inspection; invalid/oversize/rollback/ambiguous/concurrent/restart/idle/replica/provider outage tests | Transaction/attempt/correlated safe request results, durability and recovery observations; AR03/04/05/06/09/14/15 | Preserve committed acceptance, coordinate restore/replay, no blanket reset/CRM expansion; designated Data/Security/Integration reviewer |
| INT | Approved adapters/callbacks/telemetry/shared controls/alerts; signature/replay/duplicate/out-of-order/timeout/privacy/unavailable-service tests | Safe provider events/request payload audits/limits/alerts; AR04/05/09/13/14 | Disable/replace adapter safely with durable pending intent retained; reconcile external effects before retry; designated Integration/Security/operations reviewer |
| QA | Whole affected public journey and release; mandatory a11y/performance/security/privacy/outage/recovery cases, adequate measurements | Full methodology/profile/sample/build/request/restore evidence, limits and gap dispositions; AR02–05/08/09/11/14–16 | Controlled test restore/replay, rollback viable rights-valid release, preserve evidence; designated independent quality/security/recovery review |
| OPS | Actual access/legal/privacy/retention/owners/runbooks/approved release; inspect configuration and rehearsal, missed-alert/absent-owner/restore/rights failure | Actual account/access/processor/history/owner/runbook approvals; AR07/11/12/13/14 | Appoint backups, coordinated recovery/escalation and safe credential rotation; Owner + delegated operating/legal/security functions |
| LAUNCH | Actual location/release/production transition; preflight, go/no-go, approved promotion and rollback/removal cases | Explicit Owner authority/location/quality/release/operating readiness; AR07/11/12/13/16 | Safe rights-valid rollback/correction; protect accepted data, destructive effects separately authorized; Owner + designated release reviewer |
| POST | Actual public release and staff follow-through; controlled inquiry/release/monitoring/field observations, not fabricated traffic | Actual public requests/accepted test records/delivery/response/field limitations and follow-ups; AR08/11/13/15/16 | Stop new test intake if unsafe, authorized incident/correction, preserve real acceptance; operating reviewer + Owner major-phase acceptance |
Individual Child outcomes and acceptance
Individual Child outcomes and acceptance
| ID | Profile | Objective / scope | Explicit non-scope | Acceptance / required failure cases |
|---|---|---|---|---|
| PH0.PLAN.C01 | DOC | Current eight artifacts in specified order, queue, Brain/control view/handoff/report/new backup | Any proof/product/provider/ratification/activation | Full fields/traceability/consistent counts/statuses; resolved placeholders only; immutable source/prior backup integrity; missing evidence never PASS |
| PH0.VAL.C01 | VAL | H1 exact single synthetic route/island/POST/marker runtime and warm/idle measurements | Brand UI/real CMS/DB/data/secret/product/production | Technical Direction H1 mandatory checks and methodology; 20 initial warm/10 idle exploratory observations with limits; valid stop when publishing prerequisites absent |
| PH0.VAL.C02 | VAL | H2 CMS structured revisions/media/localization/preview/publication | Actual public product launch/selected-vendor inference | Draft/cache/assets isolated; approved revision traceable; published content survives API outage; failed build no promotion |
| PH0.VAL.C03 | VAL | H3 atomic journal/intent, safe identity/pooling/dispatch proof | CRM/schema product/production-data use | Commit before success; rollback/no orphan intent; ambiguous/concurrent retry and restart/republish/provider-failure recovery |
| PH0.VAL.C04 | VAL | H4 controlled email delivery/events with journal correlation | Real unsolicited messages/customer acceptance claim | Approved account/domain/SPF/DKIM/DMARC; rejection/timeout/bounce/retry/duplicate event visible; committed acceptance survives failure |
| PH0.VAL.C05 | VAL | H5 shared enforcement and legitimate-use proof | Memory-only global limiter/blanket bot lockout | Concurrent/replica-equivalent controls, bounded payloads, safe logs and dependency-failure policy; shared networks usable |
| PH0.VAL.C06 | VAL | H6 non-private approved analytics requests | Names/emails/free text/private data/acceptance dependency | Inspect actual payloads and consent/blocker behavior; conversion only after durable acceptance, outage harmless |
| PH0.VAL.C07 | VAL | H7 actual disposable-validation location/permanence/resource checks | Production geography/publish approval | Match existing North America approval or explicit exception; actual settings evidenced before H1; approved intent alone insufficient |
| PH0.VAL.C08 | VAL | H8 actual plan/history isolated restore/export/code-data compatibility | Production destructive restore/zero-loss claim | Recorded actual retention/history, recovered inquiries/intent and approved RPO/RTO proof objectives; safe replay limitations |
| PH0.VAL.C09 | VAL | H9 secret-use/staff access/MFA/environment proof | Public custom auth/real-secret dumping | Inventory view/use privilege, scoped credentials, synthetic exposure and separation, rotation/recovery owners; no leakage |
| PH0.VAL.C10 | VAL | H10 representative CMS metadata/media exit | Provider selection/rights-by-export assertion | Usable content/media references/files, account/permission/cost and completeness limitations; reconstitution verified |
| PH0.VAL.C11 | VAL | H11 actual storage isolation/export/recovery if justified/selected | Extra service by default/venture shared bucket | Project/environment/private-public/location/export boundaries; justified N/A if unselected, never false PASS |
| PH0.REVIEW.C01 | REV | Separate independent review of all eight candidate artifacts, queue and planning package | Appointment/self-ratification/implementation | Trace requirements and cross-document conflicts; issue pass/gaps/fail/blocked findings; applicable explicit ratification/conditions separate |
| PH0.REVIEW.C02 | REV | Reconcile material proofs, decisions and affected architecture/spec versions | Framework race/freeze unsupported sections | Applicable gates reviewed, open conditions held, provider/cost/ownership decisions recorded; direction-level vs full freeze explicit |
| PH1.PRESENT.C01 | UI | Approved content-first application foundation and environment-safe build | Future client/OS/auth/product expansion | Reviewed framework/version/build configuration; approved public/server boundaries; clean build/no secret exposure |
| PH1.PRESENT.C02 | UI | Responsive primary/footer/mobile navigation and layout | Empty Labs/Insights/Login/mandatory GPU | Exact destinations/order, keyboard/touch/focus/reflow; visible Music/business CTA; no hover-only path |
| PH1.PRESENT.C03 | UI | Home/practice/about/legal/work/case-study/music templates | Fabricated live proof/full artist EPK | Structured contracts, three proof dimensions, English metadata/no-JS reading; absent media/proof does not fabricate content |
| PH1.PRESENT.C04 | UI | Accessible practice-specific inquiry states | Public uploads/accounts/browser persistence queue | Invalid/loading/confirmed/ambiguous/unavailable states distinct; never success before actual durable-confirmation response |
| PH1.PUBLISH.C01 | PUB | Protected approved-revision CMS preview | Public drafts/preview inquiry into production | Authentication/cache/assets/noindex checked; actual approved revision stable; unauthorized edits excluded |
| PH1.PUBLISH.C02 | PUB | Successful-only release build/promotion/provenance | Auto-publication permission/second CMS truth | App/content/assets/approval/time attributable; failed fetch/check retains last valid release; trigger replay safe |
| PH1.PUBLISH.C03 | PUB | Media availability/export/cache withdrawal | Unjustified extra storage/private document vault | API vs CDN outages distinct; text/nav/intake useful; assets/export/corrective removal rights-valid |
| PH2.CONTENT.C01 | CNT | Actual company/offers/contact/privacy/legal/SEO copy | Invented offers/guarantees/legal compliance | Sources/approvals per revision; real responder/contact and privacy practices; unsupported copy omitted/referred for approval |
| PH2.CONTENT.C02 | CNT | Actual Work/case-study material | Venture live-system connection/fake client results | Accurate relationship/maturity/publication, permitted evidence/media/disclosure; withdrawal honored |
| PH2.CONTENT.C03 | CNT | Small approved Music proof/service material | Label/DSP/exclusive/royalty authority assumptions | Exact positioning/role/rights/asset/permission approval; no EPK or operations scope expansion |
| PH2.INTAKE.C01 | INQ | Server-validated bounded business/music contract | Upload/login/automatic commercial commitment | Invalid/oversized/unsupported practice rejected, minimized approved fields and safe errors; client bypass harmless |
| PH2.INTAKE.C02 | INQ | Atomic accepted inquiry/required intent and reviewed identity | Public lookup/CRM/exactly-once promise | Rollback/no false success; ambiguity/lost-response/concurrent duplicate/conflict tests satisfy actual policy |
| PH2.INTAKE.C03 | INQ | Durable recoverable dispatch trigger/retry/limits | Post-response fire-and-forget/custom message platform | Idle/restart/replica/timeout/unknown outcome safely recovered; accepted data retained; bounded attempts/manual attention |
| PH2.INTAKE.C04 | INQ | Restricted minimal inspect/retry/disposition process | Bespoke admin/CRM sales stages | Authorized staff find unresolved intent/acceptance safely, recover without duplicate effects; private access and audit |
| PH3.CONNECT.C01 | INT | Selected email adapter and verified callbacks | Provider events as inquiry truth | Rejection/timeout/signature/replay/duplicate/out-of-order/bounce safely correlated; acceptance invariant intact |
| PH3.CONNECT.C02 | INT | Approved non-private analytics integration | Inquiry payloads/mandatory tracking for acceptance | Actual emitted requests inspected; conversion commit-linked, consent/blocker limits; unavailable analytics harmless |
| PH3.CONNECT.C03 | INT | Selected shared anti-abuse integration | Replica-local authoritative enforcement | Concurrent controls/legitimate network usability/provider outage policy; safe diagnostics and no fake success |
| PH3.CONNECT.C04 | INT | Optional approved CRM minimal handoff | Custom CRM/journal sales pipeline | Owner adoption or explicit deferral; correlated retry/unknown result recovery; CRM outage never erases inquiry |
| PH3.CONNECT.C05 | INT | Optional approved managed booking path | Custom scheduler/booking as acceptance truth | Owner adoption or deferral; privacy/a11y/script and unavailable-vendor fallback; no false appointment |
| PH3.CONNECT.C06 | INT | Safe health/intent/error alerts and response route | Private payload logs/custom operational dashboard | Missing/delayed dispatch and failures detectable, bounded duplicate alerts, responsible operator/backup and privacy |
| PH3.QUALITY.C01 | QA | Integrated WCAG/responsive/reduced-motion acceptance | Cosmetic screenshot as conformance proof | Keyboard/screen-reader/errors/focus/contrast/zoom/reflow/no-JS/motion checks on both practices and degraded states |
| PH3.QUALITY.C02 | QA | Performance/SEO/social/media budgets | Lab metrics as adequate field proof | Measured JS/LCP/interaction/layout budgets, approved metadata/canonical/robots/media; actual limits and field follow-up |
| PH3.QUALITY.C03 | QA | Integrated headers/trust/abuse/preview/privacy/access | Unapproved risk waiver/new auth | Successful/error headers, secret/PII/draft/cache isolation, signed/replayed callbacks and shared abuse controls |
| PH3.QUALITY.C04 | QA | Integrated dependency outage/restore/replay drills | Destructive production test without authority | CMS/media/journal/email failure, failed build, ambiguous commits, restart/replica dispatch, coordinated restore/replay satisfy actual objectives |
| PH4.OPS.C01 | OPS | Actual privacy/processors/retention/access settings | Template legal certainty/default maximum claim | Legal/Owner and staff access approvals; actual scoped roles/locations/retention/MFA/secrets boundaries |
| PH4.OPS.C02 | OPS | Operating recovery/incident/response ownership/runbooks | Unsupported RPO/RTO/zero-loss promise | Named responsible/backup roles, response targets, actual recovery history/RPO/RTO/replay and alert/revocation rehearsal |
| PH4.OPS.C03 | OPS | Exact launch content/media/claim/release approval | Automatic restoration of revoked proof | Approved revision and all asset/relationship/legal permissions; correction/withdrawal plan, publisher/rights ownership |
| PH4.LAUNCH.C01 | LAUNCH | Production location preflight and explicit Owner go/no-go | Validation region as production consent | Actual compute/DB/storage/pre-created/external processor locations, reviewed quality/ops/rights and specific first-publish authority |
| PH4.LAUNCH.C02 | LAUNCH | Controlled explicitly authorized first publication | Domain/provider/resources outside cut | Only approved release promoted; attributable provenance and safe rights-valid rollback/correction; no data reset |
| PH5.VERIFY.C01 | POST | Actual public release/business/music inquiry verification | Unapproved real test PII/unbounded live traffic | Route/SEO/headers/approved revision, controlled accepted inquiries/intents/delivery and staff visibility verified |
| PH5.VERIFY.C02 | POST | Field quality and operational follow-through | Fabricated p75/traffic or treating email as response | Adequate observed field samples or explicit unproven limits, monitored intent recovery and actual responder/backup process |
| PH5.VERIFY.C03 | POST | Independent launch review/operating handoff | Automatic next feature/OS/Phase expansion | Required evidence/major-phase acceptance, risk/condition ownership and follow-ups recorded; STOP |
Current and historical state
Current and historical state
CURRENT: PHASE 0 / PH0.PLAN / BOOK.RATIFY.ONBOARD.2026-10-03. Master Edition v1.0 RATIFIED; onboarding PREPARED ONLY; all three AI roles NOT ACTIVATED. No new Child, technical authority or formal unit closure. The PH0.PLAN row's Book-status qualifier is normalized only; its scope, dependencies and acceptance/closure requirements are not reconsidered.
HISTORICAL — SUPERSEDED PLANNING-CUT STATE: PLAN.COMPLETE.2026-10-03 reported PH0 / PH0.PLAN / PH0.PLAN.C01. Its return ended REVIEW_PENDING and permission was consumed on delivery. That original disposition is not current Book state or role activation.
Historical source-gapped recovery/restoration contracts and H1 A–O evidence remain preserved in prior backups/ledger. Acceptance of v1.1-RC is a working continuity baseline, not retrospective independent closure or ratification of its roadmap/manual.
Owner Planning Disposition records Governor-assisted independent review and adoption PASS WITH CONDITIONS for the eight artifacts. PH0.REVIEW.C01 has a recorded disposition; formal unit closure is not asserted. No standing Governor, Execution or Review role is activated. Master Edition v1.0 is RATIFIED; planning adoption alone is not execution authority. The conditional Phase 0 window and later continuation cover current PH0.VAL.C01 / H1.LOCAL.PREPARE.2026-10-04. Exact local fixture has 45 passing author checks, not H1 acceptance. H1 remains BLOCKED on actual publishing/cost/review prerequisites, with published observations 0/0/0; no Child is newly created or CLOSED. Owner requests PH1–PH3/Governor collaboration, not proof of satisfied dependencies or activated roles.